I have been done my Bsc Mechanical Engineering with a CGPA of 3.38. Currently, I am doing the job as a Shift Engineer in Power House of Roomi Fabrics Limited for over 2 years and still continue. I have also done NEBOSH, IOSH PGD.IT course. I am also certified Lean Six Sigma Yellow Belt. My responsibilities with respect to current are as follows:
- Operation, Maintenance, and Control of Gas Caterpillar Engine (G3520H, G3520C).
- Participate in complete Erection and installation of Gas Engines (2XG3520H) (2.5 MW) (400V), (4xG350C 1.95 MW) (1.95 MW) (11000V), (3XG3520C) (1.95 MW) (400V).
- Installation of Heat Exchangers (Plate Type), Cooling Towers (Liang Chi, China), Steam Boilers (DDFC, SOLARKAZ).
- Valve Lash and Valve Recession and Valve Bridge adjustment.
- SCADA system Monitoring.
- Installation and commissioning of HT and LT control panels (Fico, Terberg, and Bilal Engineering).
- Supervision of Cooling Tower and Heat Exchanger on daily basis.
- Mechanical and Electrical Faults Troubleshooting.
- Testing and commissioning of ACB, VCB (ABB MITSUBISHI).
- Participate effectively in Shutdown preparation, quality checks.
- Testing and Inspection of Alternators, Ignition Transformer, and Spark plugs.
- Preparation of Genset sheet and Power generation report.
- Took part in major overhauling of Genset.
- Maintaining and monitoring load management.
- Participation as a steam member for conducting failure analysis, rework internal investigations, improvement studies, and non-routine maintenance activities.
- Preparation of oil report files.
Appoint as a Shift Engineer Mechanical Operation, Maintenance, and Control of Gas Caterpillar Engine (G3520H, G3520C).
Participate in complete Erection and installation of Gas Engines (2XG3520H) (2.5 MW) (400V), (4xG350C 1.95 MW) (1.95 MW) (11000V), (3XG3520C) (1.95 MW) (400V).
Installation of Heat Exchangers (Plate Type), Cooling Towers (Liang Chi, China), Steam Boilers (DDFC, SOLARKAZ).
Valve Lash and Valve Recession and Valve Bridge adjustment SCADA system Monitoring.
Installation and commissioning of HT and LT control panels (Fico, Terberg, and Bilal Engineering). Supervision of Cooling Tower and Heat Exchanger on daily basis. Mechanical and Electrical Faults Troubleshooting.
Testing and commissioning of ACB, VCB (ABB MITSUBISHI). Participate effectively in Shutdown preparation, quality checks.
Testing and Inspection of Alternators, Ignition Transformer, and Spark plugs. Preparation of Genset sheet and Power generation report.
Took part in major overhauling of Genset.
Maintaining and monitoring load management.
Participation as a steam member for conducting failure analysis, reworking internal investigations, improvement studies, and non-routine maintenance activities. Preparation of oil report files.
Enhance reliability and availability of equipment.
- Learned about the working of Turbo Jet, Turbo Prop Engines.
- Whole maintenance of the engines will be done in PPOH, ACOH.
- Learned about Non-Destructive Testing (NDT), APU.
Enhance reliability and availability of equipment.
- Learned about working of Gas Turbine (GT), Steam Turbine Generator (STG).
- Focus on HRSG that uses steam coming out of GT and utilizes it for the working of STG.
Working of Coal Power Plant.