Seekng a professional job in well organized and well reputed organization, where i can use my knowledge and experience to help the company achieve its goal of excellence in the field.
PM at RAILCOP
Working as an “Assistant Project Engineer”, Railway Construction Pakistan Limited, at Construction of Air University Academic Block-01 Project, Multan.▪ Assist Senior Engineer in designing, developing and executing construction project.▪ Work with Senior Engineer in reviewing project specification, preparing project plan and work schedule.▪ Work with engineering team in developing construction plan.▪ Determine budget, schedule, manpower, material and equipment requirements to execute construction project.▪ Provide technical assistance to field staff when needed.▪ Analyze construction problems and recommend corrective actions.▪ Analyze drawings and work to execute different activities as per drawings and specifications.▪ Personally, supervise the construction activities executed on site.▪ Task distribution in all supervisors to gear up the work progress.
Worked as a Junior Site Engineer at the project named as Construction of Residential Units at Royal Orchard Multan.
Determined project feasibility by estimating the quantities and cost of labor, equipment, and materials.
Prepared and presented reports to the public, including those on environmental impact, property descriptions.
Oversee all construction, maintenance, and operations activities on project sites.
Guide client/financers by providing technical advice regarding design, construction, structural repairs, and program
modifications.
Inspected construction activities executed on site, monitor progress and ensure the construction should be according to
the drawings and design specifications as well as safety standards are being met.
Supervised the layout of structure, backfilling, formwork, reinforcement, concrete pouring and finishing utilities.
Worked as Tarinee Engineer at Dualization and Improvement of National Highway, N-55 from Sep,19 to Dec.-20.
Responsibilities/Accomplishments:
Worked for Dualization of Indus Highway managed construction site and conducted on-site inspections with senior engineers/material engineers in accordance with project specifications; generated BOQ, BBS of culverts.
Analyzed construction drawings & maps. Assured compliance with technical specifications and safety legislation. Leveraged technical and expert knowledge of construction material and supplies for efficient contract management. Held meetings with clients to discuss general contracts, purchase orders, subcontract agreements, etc.
Reviewed drawings with the help of site engineers and supervisors.
Maintained highly professional environment among the laborers and staff in terms of productivity and deadlines. Drafted daily work reports and reported to higher officials. Inspected work in progress to ensure that work conforms to contract specifications and adheres to established work schedules.