概要

 Preparation of shop drawings for Reinforcement.
 Preparation of shop drawings (Major & Minor Hydraulic Structures, Bridges, Engineer Site Facilities, Piles etc.)
 Preparation of shop drawings (Main Dam, Spillways, Tunnel etc).
 Preparation of Bar Bending Schedule.
 Preparation of As Built drawings.
 Preparation of Earthwork Drawings (Desilting, Embankment cut & fill x-sections, Backfilling for structures).
 Preparation of Earthwork Drawings (Main Dam, Coffer Dam, Auxiliary Dam, Spillway & Tunnel).
 Sheet setup for plotting & submission.
 Import data to Eagle Point from Excel/Total Station.
 Preparation of Profiles using Eagle Point software.
 Marking detailed RDs on Profile with Eagle Point.
 Preparation of X-Sections.
 Preparation & plotting of Templates for X-Sections.
 Preparation of Running Bills.
 Preparation of Measurement Sheets.
 Preparation of Backup for running bills.
 Verification of Bills from Client Representative.
 Maintaining record of IPC’s, Check Requests.

项目

Guddu Barrage ,Ghotki Feeder Canal Project & Naulong Dam

工作经历

公司标识
autocad operator
Descon Engineering
Oct 2015 - 代表 | Lahore, Pakistan

学历

Govt college of Technology Rasul GCT RASUL
中级/A级, 理学院(工程预科), dae civel‎
drawing
等级 B
2009

技能

熟练 Architecture Skills

语言

中级 英语