Focused and innovative Civil Engineer with experience in engineering design from the initial conceptual stage and feasibility study through to the detailed final design. I have a passion for learning and developing new and existing skills, and I enjoy problem-solving using established analytical methods and engineering principles. I am keen to secure a challenging role in an engineering firm that offers early responsibilities and a progressive career path
Designed model of Hand Wash Station
Prepared Bill of Quantity (BOQs) for Hand Wash Station
Conducted feasibility study(socially and technically)
Conducted surveys for identification of sites
Conducted regularly visit for checking progress of works
Conducted follow up visit for smooth function of installed hand wash stations.
Resolved any unexpected technical difficulties and other problems that may arise
Worked towards strict deadlines, often under continues pressure
Prepared and reviewed of support documentation for project reporting process
Maintained safety on site through promoting a safety culture
Supervised technical and associated works.
Demonstrated and performed experiments in the following labs
Structured engineering
Reinforced concrete
Civil engineering drawing
Land survey
Transportation and Materials
Testing samples of construction material under controlled laboratory conditions (concrete cube/Beams, soil samples, Aggregates, Bricks, Cements, Sand, Bitumen etc
Supervised construction activities to ensure compliance with specifications as well as monitoring and evaluation of repairs and maintenance.
General and Technical Site supervision of Civil works at power sub-stations, including foundations, trenches, control building and associated works
Monitor progress of Civil Contractors as per the schedule agreed
Direct construction, operations, and maintenance activities at project site
Worked on engineering designs preparing reports, construction drawings, specifications, calculations, equipment selection for various project
Identified environmental risks and developed strategies for handling them on each project.
Worked towards strict deadlines, often under continues pressure
Regularly checked progress of works according to the schedule
Determined project feasibility by estimating the quantities and cost of labor, equipment, and materials
Identified environmental risks and developed strategies for handling them on each project
Checked plans, drawing and quantities for accuracy of calculations
Directed and participated in surveying to layout installations and establish reference point, grades, and elevations to guide construction
Inspected project sites to monitor progress and ensure conformance to design specifications and safety sanitation standards
Planning site activities in detail, setting targets and accurately forecasting completion dates
Directed and supervised workers
Scheduled material and equipments purchases and deliveries
Learned Layouts
Learned Estimation
Learned Supervision
Learned Engineering Drawing
Learned Worked according to specifications
Shadowing the Senior Site Engineer in his day-to-day activities
Conducted regular site visits with senior engineers to check the finishing works and take appropriate corrective actions
Learned and Performed site planning and layout
Learned water and waste water flows for site utility improvements
Learned Engineering Drawing
Learned Performed site grading and earthwork
Learned Worked according to specifications
Inspected project sites to monitor progress and ensure conformance with design specifications, quality requirements and required standards
Shadowing the Senior Site Engineer in his day-to-day activities
Conducted regular site visits with senior engineers to check the finishing works and take appropriate corrective actions