To be a part of a reputable organization offering challenging careers which will put my qualities, professional skills, and strengths into a test and help me accomplish its targets with an optimum level of accuracy determination and excellence with this as my inspiration I seek this position to realize my dreams.
Installation of foam water and fire water Sprinkler and Hydrant, fire fighting system with complete pump and foam skid. Installation of Deluge system and FM200.
Preparation of ISO and coordination drawings of fire foam and fire water system
Preparation of weld maps and BOQ according to drawings.
Installation of Firefighting pumps (Electrical, Diesel & Jockey)
Major Duties:
§ Installation of firefighting piping and its accessories. Installation Of fire alarm & emergency Systems.
§ Installation of fire protection equipment’s and specialties i.e. Sprinkler System, Fire hose cabinets, fire hydrants, Deluge systems, smoke detection, heat detection, emergency lighting system.
§ Testing and commissioning of complete fire protection system as per specifications and Engineer’s recommendations.
§ Installation of Fire Fighting Pumps and Tanks.
§ Installation of field devices in Fire Protection system System.
§ Installation of FM200 System piping and Devices.
§ Installation of FM200 Gas Cylinders.
Major Duties:
§ Plant InCharge (Static/Piping/Rotatory).
§ Complete Maintenance During Shutdowns and Running Plant.
Major Duties:
▪ Mechanical Engineer - Operation And Maintenance.
▪ Establish and supervise all the Drawings of underground chambers for new construction work.
▪ Complete assembly and installation of ABB and KROHNE Flow meters on 150mm to 900mm ductile water pipelines in all over Makkah City, KSA.
▪ Leak detection through Smart Ball and Fuji Tecom apparatus.
▪ Installation of Gate Valve on ductile water pipelines of Diameter 150mm to 900mm.
▪ Building up and Maintenance of underground chambers for Flowmeters, Strainers, dismantling Couplings, Butterfly Valves.
▪ Preparing project reports and presentation of project progress.
▪ Onsite project management and inspection of work on every site.
▪ Major Duties:
▪ Carrying out feasibility studies on water and wastewater projects
▪ Taking part in planning and designing during the implementation of a water and water waste project.
▪ Evaluate Project Performance.
▪ Daily Power monitoring, calculations and reporting at monthly basis.
▪ Prepared monthly reports for senior managers.
▪ Create and update engineering drawings using Auto CAD.
▪ Analysis of the performance of pumps (Vertical, Horizontal) and motors on different disposal plants throughout the city (Faisalabad) daily basis.
▪ Auto CAD, Pro-E Modelling in Design section, AARDIC.
▪ Major Duties:
▪ Study and research on the suitable material for the Turbine Blade.
▪ Basic of the science of Nano Materials.
▪ Development of a New Nano Material for the Turbine Blades.
▪ Mechanical Testing of that New Nano Composite Material.
▪ Major Duties:
▪ Practical Knowledge of all kind of Manufacturing Processes.
▪ Basics of Quality Control Analysis.
▪ Study of Supply Chain and Production Management.