Project Handle:
1. Sanofi Aventis Pakistan limited
• Lead of Mechanical project at head office project.
Screw Chillers installed.
A.H.U’s installed.
Exhaust air fans installed.
Pumps installed.
Cooling towers installed.
Building management control system installed.
Electrical panels and controls installed.
Air balanced, water flow balanced.
A.H.U’s installed.
Connected on BMS.
We have successfully provided that project to sanofi aventis.
• Lead of Mechanical project at flygyl area (staging area).
Air cooled Split Type Unit installed.
We have successfully provided that project to sanofi aventis.
2. Martin Dow Pvt. Ltd.
• Lead of Mechanical project at quality control lab.
A.H.U’s installed.
Exhaust air fans installed.
BMS installed.
Air balanced, water balanced.
Process pipes installed and connected with GMP drains.
Hot water, city water (treated water), Air compressor lines installed.
We have successfully provided that project to martin dow.
3. Getz Pharma
• Lead Mechanical project at Utility area.
Hot water systems dismantled by utility area and Re-installed these at plant room.
Shuangliang steam fired chiller installed.
Cooling tower installed.
We have successfully provided that project to getz pharma.
4. Abbot laboratories
• Leading mechanical project at technical area.
AHU’S installing.
Hot water pumps installing.
Chilled water, steam and hot water pipes installing.
Duct installing.