Aim to be associated with a progressive organization that gives me scope to update my knowledge and skills, where creativity, hard work, and sincerity are recognized and well rewarded.
❖ Currently involved in shift activities and working as Shift Engineer to run the plant safely and sustainable operation, manpower management, developing log sheets, checklist & SOPs, and site applicable protocol for the safe and reliable operations of the system on an ongoing basis. ❖ Good understanding and knowledge of Cooling water treatment, BFW treatment, Raw Water, and Portable water treatment.
❖ Optimizing SOx, NOx, COx in the recommended range of HHI and Environmental Protection Agency (EPA) using lime dosing in Fluidized Bed Boiler and also, use efficient and even distribution method for controlling all the pollutants in the recommended range.
❖ Analyze coal using different analysis methods and optimize coal combustion using frequent combustion analysis in GC apparatus and through this optimize lime and coal consumption of boiler.
❖ Coordinate with Chemical Vendor for changes in dosing and maintain parameters as per the recommended limits
❖ SAP PP module working as the making of Daily Production Reports and managed sales deliveries and budgeted targets. Also, create preventive and corrective maintenance plans on the SAP PM module.
❖ Perform the performance test of the cooling tower and STGs
❖ Implementation of the plant audits as per the audit plans for safe operations of the plant
❖ Actively involved & participated in the following activities: ▪ Steam turbine safe & reliable operation with start-up & shutdown ▪ Cooling Tower Start-up & Shutdown ▪ Troubleshooting of turbine, C.T & boiler equipment ▪ Involved in Turnaround activities and organized jobs as per job lists. ▪ Safe & Reliable operation with start-up & shutdown of C.T, Boiler,
Owns CIL Pillar, SHE Pillar & Quality PillarUnderstands the gaps identified and draws corrective actionsFollows the progress of the actions related to his pillar KPI'sDevelops a Masterplan for Each of his PillarPlans defect fixing with his Maintenance Lead Manager to prioritize high & critically defects Develops Machine Improvement (OEE%) and OR% action items to comply with factory KPI'sAttends Daily DDS, Weekly DDS & Monthly DDS (4th-Weekly/Month) to track direction vsprogressReview Initial problem-solving cards and prioritize actions
Being working in a state-of-the-art coal power plant with versatile two different frequencies (50Hz & 60Hz) power generation capabilities.
60Hz power to fulfill all the requirements of the fertilizer complex while 50Hz for the national power grid.
I have gained good working experience.
G.E Thermodyne (02×24 MW, 60Hz condensing steam turbine)
G.E Nuovo Pignone (01×60MW, 50 Hz condensing steam turbine).
G.E Nuovo Pignone (01×10 MW, 60Hz non-condensing steam turbine)
02×250 TPH (92 bar & 515°C), HHI CFBC boiler.
BOP including cooling towers, open & closed loops cooling water pumps, etc
Safe & Reliable operation with start-up & shutdown.
Line tracing & troubleshooting activities.
Control and coordinate all production related activities shift wise in the respective area to achieveproduction targets on time within set standards.
Prepare, implement, monitor and review all cleaning, operating, manufacturing and otherprocedures to achieve good quality, enhance productivity and yield.
Ensure all production activities aimed at achieving good and consistent quality products minimizenumber of customer complaints & non-conformance's and quick response to fulfill plannerdemands.