I am a results-driven professional with a track record of overseeing entire the construction process from start to completion while liaising with project developers to maximize efficiency, safety, and quality. Skilled in setting out primary and secondary control of construction works, QA, and H&S to manage a set of tasks safely. In-depth understanding of quality assurance, design process, equipment limitations, and methods. Instrumental in implementing ITP requirements and creating method statements. I am adept at leading and completing construction projects in line with budget and time constraints. Proficient in topographic surveys, setting out and levelling surveys.
My key skills include Site & Setting Out Engineering ● Land Surveyor ● Levelling ● Total Station ● GNSS-GPS ● Health, Safety, Environment & Welfare Assurance ● Quality Assurance ● Design Process ● CDM (Construction Design & Management) ● Site & Materials Management ● Welfare Assurance ● Team Leadership & Training ● Risk Management ● Problem Resolution
My professional background and great industrial exposure coupled with an excellent track record makes me an ideal candidate for executive roles. As such I would welcome a discussion regarding opportunities with your organization that fit my background.
Developed and oversaw materials, site, and all project activities. Collected survey data by using EDM/GPS.
Key Accomplishments:
· Assured optimum safety and health by devising and administering strategic risk assessment, welfare facilities, and all environmental safety functions, site policies, processes, and permits to dig management.
Investigated accuracies of GPS (Global Positioning System) and TS (Total Station) in a topographic survey. Oversaw a total station, GPS, and data collector while performing topographical, boundary, control survey, and construction staking. Examined key information by using geographic information systems (GIS) and drawing charts. Provided users with positioning, navigation, and timing services. Prepared drawing for the construction purposes. Managed surveying works during the full phases of a construction project to conduct all measurements and calculations at survey sites. Developed and oversaw materials, site, and all project activities. Collected land survey data by using GPS system. Assumed and maintained liability for assessing project budgets and cash flow forecasts and performing site measurements. Produced and maintained various bill of quantities as per technical drawings.
Key Accomplishments:
Conducted a wide range of field surveying activities such as boundary, municipal, topographical, construction, geodetic, while using robotic total stations and GPS at a variety of sites and field conditions.
Streamlined and supervised construction activities according to the drawings and codes line with strategic requirements to ensure seamless and efficient work flow.
Assured optimum safety and health by devising and administering strategic risk assessment, management plans, and all environmental safety functions, site policies, processes, and methods.
Succeeded in retaining funding and facilitating pre-development, construction, and permanent phases to create and deliver funding applications.
Actively involved in the reinforcement detailing, check, schedules, and drawings issued by designers. Retained accurate knowledge of occupational health and safety policies and procedures while performing site engineering tasks. Calculated the estimate of working day work such as, steel work, concreting work, form work, and excavation. Created and executed effective policies, and methodology to ensure documentation and correspondence for all planning and scheduling related matters. Prepared and delivered estimates of project costs and durations at all stages of the architect’s methodology of activities from conceptual design to construction documents. Maintained accurate records on the progress of projects and delivered reports to the client in a timely manner.
Key Accomplishments:
Developed and linked new housing apartments with the main optical fibre system through close collaboration with high-performing team of four assistant engineers and 16 supervisors.
Identified, discussed, and determined complex issues to ensure optimum efficiency while conducting meetings with consultants, clients, and contractors.
Applied AutoCAD to develop site plans, designs, conceptual layouts, images, and frame structure. Applied electronic distance measurement to determine the length between two points by using electromagnetic waves. Achieved desired results by formulating progress reports, letter of intent, contractor bidding, rate analysis, and construction codes while following ISO standard and using CCM software for BOQ. Generated, retained, and presented progress reports to the contractors, consultant, and management on a regular basis. Delivered strategic direction to clients on multiple solutions. Organised and oversaw the forecasting and scheduling of activities.
Key Accomplishments:
Developed and strengthened long-term working relations with suppliers and vendors to determine material costs and secure best pricing.
Gained project ownership experience and performed site inspection and documentation to determine requests.
Set a benchmark of excellence by directing construction services on public works projects and finalising contract closeout of substantially projects.
Examined proposed building materials and methods of construction to ensure acceptability based on suitability, durability, and cost of maintenance for various types of development.