خلاصہ

To work in the dynamic, team oriented, competitive and cooperative environment in a reputable organization, where there is maximum chance of learning and grow as a proficient, innovative and committed person.
I am looking for a position, where I can learn and improve my engineering knowledge and where I can utilize my engineering, electrical, power, communication skills and interpersonal skills for the growth of my company and career.

تجربہ

کمپنی کا لوگو
online work
FIVERR
جنوری ۲۰۱۹ - موجودہ | Faisalabad, Pakistan

“DESIGNING OF PV SOLAR SYSTEM”

• Load Calaculation for PV System
• Modules sizing for PV system.
• Inverter sizing for PV system.
• Battery sizing for PV system.
• Charge controller sizing for PV system.
• Cable sizing for PV system.
• Cost analysis for PV system.
• Project design on PVSyst Software
• Shadow Analysis for Solar System on
SketchUp Software

کمپنی کا لوگو
Electrical & Testing Engineer
TESCON POWER ENGINEERING COMPANY
اکتوبر ۲۰۱۷ - موجودہ | Faisalabad, Pakistan

Responsibilities: Testing of AIS & GIS Power Grid Stations
• Testing performed on power transformer
 C & DF test , Turn Ratio Test & Open circuit & Short circuit test
 Winding Resistance test , Insulation Resistance test & Earth
resistance test
• Testing performed on 132KV & 220KV (AIS & GIS) Current
transformer (C.T)
 Ratio test , C & DF Test , Polarity Test, Insulation Test & Earth
resistance test
• Testing performed on 132KV & 220KV (AIS & GIS) Circuit
Breaker (C.B)
 Contact Resistance Test, Earth resistance test & Insulation
Resistance Test
 Timing ( Opening & Closing) of Circuit Breaker
 Hi-POT Test, Gas Purity test and Dew Point Test
• Testing performed on Surge Arrestors, Line & Bus Isolators (AIS
& GIS)
 Hi-POT Test of Surge Arrestors, Line & Bus Bar Isolator
 Earth resistance Test of Surge Arrestors, Line & Bus Bar
Isolator
 General Checks of Surge Arrestors, Line & Bus Bar Isolator
• Testing performed on Power cables
 High Pot test of power cables of power transformer & capacitor
Bank.
• Testing performed on Capacitors Bank
 Measured Capacitance & Charging Current of capacitors in
capacitor Bank.
• Study of Electrical Drawings (switchgear panel drawings and
power equipment drawings)
• Electrical Calculations during testing to compare practical
results with FAT reports.
• Troubleshooting during testing of power equipment.
• Documentation for testing report of Grid stations.

تعلیم

UET LAHORE
بیچلرز, بیچلرز ان سائنس, Electrical Engineering‎
Electrical Power
CGPA 3.1/4
2017

پیشہ ورانہ مہارتیں

ماہر BE
متوسط Electrical troubleshooting
متوسط Electro mechanical troubleshooting
متوسط general wiring
متوسط Instrumentation
متوسط Site Activities
متوسط time and resource management
متوسط troubleshooting
متوسط 1 year experience
متوسط 2D Drawaing
متوسط A 'Can do' attitude
متوسط Accounts Administration
متوسط Analysis of Information
متوسط Analytical Skills
ابتدائی Calibration
ماہر Configuration Switches
متوسط Conservation Awareness
متوسط Cooordination Skills
متوسط Documentation
ماہر Draw Skills
ابتدائی Electric Knowledge
ماہر Electrical
متوسط electrical equipment production and control
متوسط Electrical Estimating
متوسط Electriction
متوسط Electronic Repairs
متوسط Electronics Troubleshooting
متوسط Engineering Analysis
متوسط Engineering Skills
متوسط Equipment Maintenance
ماہر Fresh Graduates with good electrical basic
ماہر Handling Assignments
متوسط Machine Program Handling
ماہر Maintaining Safety Standards
متوسط Malfunctions Identification
متوسط Mechanical Work
ماہر MIT Knowledge
متوسط Must have experience to work with NESPAK/WAPDA
متوسط Must know how to read engineering drawings
متوسط Operational Tasks Handling
متوسط Plant Operations Handling
متوسط Presentation Skills
ابتدائی Production Coordination
ابتدائی Production Monument
ابتدائی Production Planning
متوسط Production Quality Monitoring
ماہر Pursuing News Stories
متوسط Safety Management
متوسط Solar
متوسط Solar Electrician

زبانیں

ماہر پنجابی
ماہر اردو
متوسط انگریزی