خلاصہ

PROFESSIONAL EXPERIENCE

1. From 15th May 2015 i am working as Assistant Manager Electrical in Al-Hussain Traders Contractors Lahore, Posted in Hyderabad.
Project 220KV New G/S Jhampir to 220KV T.M Khan (Lot-I).

2. From 11th Feb 2013 to 30th April 2015, worked as an Electrical Engineer in Integrated Digital System (IDS) Hyderabad.

3. From Sep 2012 to Feb 2013, worked as a Technical Assistant (Procurement) in SIEMENS Pak. Engineering Company Karachi.

Responsibilities
Responsible for the preparation of TOCO (Total Cost of Ownership of Projects).
Responsible for the preparation of Comparative Statement of suppliers offer.
FAT (Factory Acceptance Test) I am also perform a Fat Auditor.

4. From Sep 2010 to Sep 2011, worked as a Trainee Engineer (Electrical) in AL KARAM GAS TURBINE POWER GENERATION PLANT at Karachi.

Responsibilities
Operation Maintenance of Power generation plant which includes
Analyzing, Monitoring and measurement of Temperature.
Analyzing, Monitoring and measurement of Pressure Load of DEMI water treatment plant, Turbines Boilers on Hourly basis with various test gear instruments to perform preventative and corrective maintenance.

تجربہ

کمپنی کا لوگو
Assistant Manager Electrical
Al-Hussain Traders Contractors Lahore.
مئی ۲۰۱۵ - اگست ۲۰۱۵ | Hyderabad, Pakistan

کمپنی کا لوگو
Electrical Engineer
Integrated Digital System (IDS) Hyderabad.
فروری ۲۰۱۳ - اپریل ۲۰۱۵ | Hyderabad, Pakistan

کمپنی کا لوگو
Technical Assistant (Procurement)
Siemens Pakistan Engineering Co. Ltd.
ستمبر ۲۰۱۲ - فروری ۲۰۱۳ | Karachi, Pakistan

• Responsible for the preparation of TOCO (Total Cost of Ownership of Projects).
• Responsible for the preparation of Comparative Statement of suppliers offer.
• FAT (Factory Acceptance Test) I am also perform a Fat Auditor.

کمپنی کا لوگو
Trainee Engineer (Electrical)
Al Karam Textile Mills (Pvt) Ltd
ستمبر ۲۰۱۰ - ستمبر ۲۰۱۱ | Karachi, Pakistan

• Operation & Maintenance of Power generation plant which includes:
• Analyzing, Monitoring and measurement of Temperature.
• Analyzing, Monitoring and measurement of Pressure & Load of DEMI water treatment plant, Turbines & Boilers on Hourly basis with various test gear instruments to perform preventative and corrective maintenance.

تعلیم

Mehran University of Engineering & Technology
بیچلرز, , Bachelors of Engineering‎
(1)Calculus & Statistic (2)Power Generation(3)Electrical I|nstruments
2010

پیشہ ورانہ مہارتیں

متوسط Corporate - Procurement / Administration Departmen
ماہر Handling Assignments

زبانیں

ماہر اردو
متوسط انگریزی

Daniyal آپکے جاننے والے

Farina Sadiq Baloch
Mr.Biomed Tech Services