To utilize my recent education and experience acquired to secure a challenging
position within a dynamic and challenging organization where I can contribute to the growth of both,
the company and myself.
FME Team Lead senior engineer doing wel at warid project wants to relocate .
Worked in New Installation and Implementation with Sedder Tellecom
APD(KSA) at Zain Project LTE 1800MH, 3G 2100MH, LTE 2300MH RF Swap in
Riyadh Central.
Managing more than 200 sites regarding HUAWEI BTS 3900, DBS 3900, ATN
905 and ATN 910. South reigion KSA.
o CM & BSS coordination of 200 sites of South region.
o Handling of Alarms in Adjustable Short time.
o To ensure the network availability as per assigned targets.
o Confidentially dealing with OPERATOR
o Preparation and submission of site log sheets.
o Finalizing reporting and error checking.
o Online support with level 1 Team and higher management.
o Check TT and availability of 3G Network.
o Working on Huawei RTN Transmission 910,950,980 and BTS 3900 for 3G Network.
o Share Outage Report and fix issues of outage on daily and monthly basis with STC.
o Responsible for installation, commissioning and integration of Huawei 3G BTS 3900
and MW RTN (910, 950). ATN (905 , 910).
o Installation of XPIC link , 1+0 , 1+1 , 2+0 protection , Diversity Links.
Planning, Survey and Implementation, Commissioning for the SWAP and Expansion Project for the
ZAIN, including Huawei 3G and 4G 3ple band antenna.
o Planning and implementation of Digital Cross connects and PCM/MW/OFS connectivity from Bsc-Bts
and Bsc-Msc. End to end E1’s connectivity, Testing, media Troubleshooting and Media clearance
intercity and intra city.
o Have done Different MW LOS Surveys & Making the Technical Site Survey Reports.
o Troubleshooting all the Problems occurring on BTS & MW Site and Rectify them before site
Acceptance performed.
o Remove the KPI issues of swapped sites with the coordination of RF department.
o Planning, Implementation and commissioning of Back Bone Networks (MW & Optical).
o Conducting Quality Assurance Test (Online & Offline) to make site upto Standard of Customer.
Installation Standards as per customer demand.
Well known about the Quality Assurance & Quality Control Techniques.
Done many LOS and Technical Site Surveys (TSS) and have knowledge of various equipments
like German GPS & Compass.
I have done the transmission swap.
Completely responsible for installation, configuration and quality assurance of Microwave Links.
Configuration of Microwave Equipment (1+0, 1+1) Links.
Have adequate knowledge of assembling and installation of Hybrid Coupler, High & Low ODU.
Installation and commissioning via WEBLCT software of 1+0, 1+1, SDH, PDH,SD,XPIC and XPIC
SD(1+1)RTN 900 MW links.
Supervision of transportation of Goods delivered to BTS sites