To be a part of the challenging team as a professional Engineer, which strives for the better growth of the organization and which explores my potential and provides me with the opportunity to enhance my talent with an intention to be an asset to the company.
Come 1. I had worked as Electrical Lead worker Engineer on the project of RLOC (Qatar Chemical LLC ) through the Deacon Engineering.
2. I had managed a team of 0-10 persons under the supervision of a Manager of Alliance of the QChem and Deacon on the Project of the Shutdown maintenance at the industrial city of RLOC ALKHOR Qatar.
3. During my job at the QChem I have mainly worked on the Electrical Power systems management and development of the Oil&Gas plus Chemical plant.
4. Worked with multiple foreign companies employees during my job placement.
5. Learn a lot of new skills and developed many things which are useful for a professional Engineering graduate.
6. I have also worked as a safety professional due to the job requirements as a electrical Lead worker with strict safety measure on the job.
7. Manages the daily task according to the commands of the Coordinater. e.g PERMIT TO WORK JOB SAFETY ANALYSIS.
• Worked on the Automation and control of Soccer Bladder manufacturing Pin Curing Machine at 2nd Unit of the factory.
• Learned the basic working principles for HMI of a PLC devices during the hardware and software programs installation in the Pin Curing Machine.
• Performed the duty to note down on daily basis the KWH value of all major LT panel and HT panel.
• My main Description of job role on this Industry is to worked on the hardware and software installation of a newly idealized project of Apparel and Garments Manufacturing.
• During the Installation of the INA computerized intelligent hanger systems at SSG Main Campus I have worked with the INA Singapore officials on the Electrical Electronics equipment’s installations later on maintenance throughout the very first day of work start.
• I have gained experience of hardware related technical issues which can be effective in the progress of whole machine setup, also worked on the WCB (Wi-Fi Can Bridge, DC Hub Connections, RFID Technology, DC Gear Motor, LED Display, Hardware and RTD PC Screen Interface, Employ data Display Device setting, DC Solenoids, 12/24v DC Power Supply, LED Lights Connections).
• I have also calculated the total consumption of load per line to demonstrate the Electrical load cost, later we have install the UPS (10KVA) backup systems for continuity running of the garments stitching machines and whole of the process.
1. I have worked as a project management professional for a short term project for the Electrical Energy comparison and Management for the whole industry as per the requirements of the auditors of the industry.
2. Calaculate the total electrical load of the industry and brought into the mind of the industry the losses which has been occurring through the consumption of the electrical load.Â
3. After calculating the load of the industry I have also set a limit in the usage of the load in different departments of the industry with priority precautionary measures to enhance the electrical work requirements as per the requirements of the auditors in visit.
• In this job of Telecom I have worked on the Radio Frequency Wireless Communication technique LTE Network for optimization of signals and its parameters.
• Do the drive test on daily basis for optimization of Radio Signals by analyzing the different parameters of LTE network drive test.
• Enhance my computer software skills by working on Huawei “CDS & HUA” for the drive test of LTE network and also get experienced of using the wireless radio communication handset for drive analysis of signals on the project of “Huawei Lahore Safe City Authorities”.
• Learn the basic knowledge of work at height and safety precautions for drive test EHS requirements through the help of ‘ISDP Huawei’ training and application work.
• Works with Huawei Chinese engineers through the help of Turnotech management for daily processing, optimization, enhancing of the LTE network.
• Obtained the EHS Professional Certification on ‘First Aid and CPR training course’ and Huawei work passport Pakistan office by the affiliation with HSE culture developers Lahore.
• During my job I have learned the different parameters of Radio Frequency Drive Test of LTE network which are: RSRP, RSRQ, RSSI, SINR, CQI, PCI, BLER, DL Throughput and UL Throughput.
• Performed the daily task with the help of Rigger as a team on antenna direction when required to maintain the hardware issue related to mechanical and electrical tilt and direction with angle later in the end of the day sends it to manager for daily optimization of radio signals path.
• Our company Turnotech is contract based private company which provide the technical telecom solutions to government and private company.
• Provided technical support in the resolution of complex power system concerns.
• Coordinated plans and implementation of large scale project electrical circuitry.
• Designed technical plans and supervised technology surveillance to support electrical power flow in system layers, Worked alongside senior power engineers in the review of design and stress analysis reports.
• Developed reliable operational electrical system guidelines.
• Performed tasks that supported power testing program prior to release of product.
• Worked with engineers to evaluate power distribution system capabilities.
• Create medium-voltage designs for commercial and residential premises.
• Review and analyze system parameters.
• Prepare materials forecast.
• Create plan for implementing electrical designs.
• Calculate data and determine cable, breaker, and transformer sizing.
• Manage installation projects.
• Design and manage upgrades to existing systems.
• Gained experience installing wiring looms and working to circuit diagrams and schematics.
• Developed problem-solving skills including how to deal with tricky intermittent faults.
• Worked well in a team of three cable installers and later went on to work under my own supervision.
I had worked at PTCL Sialkot Cantonment Branch of Sialkot City after graduating from the University.
During my Trainee-ship i had learned about the experience of Wireless Management department of the PTCL.
Install the Fiber Optics new cable project with in the city and out of the city as well.
Collaborate with the seniors and colleagues to determined the time management on the site.
I have been worked at PTCL Head Office Central Exchange Branch located at Paris Road near GPO Sialkot, Sialkot.
My responsibilities was their is to assist the seniors Engineers and Technicians with my Knowledge and Experience.