I am a performance-driven engineering professional with extensive experience creating innovative, cost-efficient designs within a Mechanical Construction, Piping & Pumping, Fabrication, and HVAC engineering environment. Solid expertise in applied research, new content development, simulation, and validation. Superior problem-solving and time-management abilities; adept at identifying the root cause of issues and implementing creative, targeted solutions. Team-spirited with effective communication and presentation skills, able to coordinate with management, vendors, and staff to achieve goals.
My key skills include Project Management • Leader Standard Work • SAP (Plant Maintenance Module) • SMAW (Sheet Metal Arc Welding) • ISO 9001 – 2015 • QMS (Quality Management System) • API 1104 (Standard for Welding Pipelines) • Microsoft Office (Word, Excel, PowerPoint, Outlook, and Project) • AutoCAD 2D Single line and isometric / 3D (Civil, Mechanical and Electrical) • Pro. Engineering 3D • HTML, Web Developing • Team Building • Computer Proficiency • Leadership Experience • Lean & Continuous Improvement (KAIZEN) • Collaboration Talent • Problem Solving
My professional background and great industrial exposure coupled with an excellent track record makes me an ideal candidate for executive roles. As such I would welcome a discussion regarding opportunities with your organization that fit my background.
Senior Officer, Engineering (Utilities), Feb 2021 – Present
Officer, Engineering (Utilities), Oct 2018 – Jan 2021
Led Maintenance & safe operations of HVAC System, Chiller Plant, Air Handling Units, dehumidifier, split units, self-contained package units, fan coil units, air ventilation fans, exhaust fans, Effluent Treatment Plant, Waste heat recovery boiler, Package type duplex boiler, Steam generators, Distillation plant, softener plant, R.O plant, Screw air compressors oil-free and oil-injected, Pressurization Vessels, cooling towers, wellbores, water feeding & circulation pumps, multistage pump, plumbing work, paintwork, nitrogen generation plant & power generators. Operate SAP (System, Application and Products) “plant maintenance” module. Create maintenance orders, receive notifications, update equipment’s master data, task list, preventive maintenance scheduling, reservations/material issuance, and reports at the end of every month.
Key Contributions:
Led chemical testing and sampling of Boiler’s water Chillers’ (chilled & closed condenser water), KDA water, softener water, cooling towers, regeneration of softeners, brine solution preparation, chemicals dozing, anti-scalant dozing, Blowdown of cooling tower water, and the system water for maintaining its TDS limits within parameters.
Scheduled and executed the preventive, corrective & breakdown maintenance; also coordinated with plant engineer for modification & amendment of plant machinery for enhancement and control the losses.
Responded to all outsource vendor-related local parts for utilities; inspected issues, validation, and the maintenance of the project equipment lists and other key engineering documents as applicable to each project.
Planned, designed, and installed new equipment and projects as well as provided professional advice and recommendations regarding utility improvements, new and additional facilities, and technical operational matters.
Identified potential opportunities to improve reliability and reduce operating costs, led ISO documentation related to utilities section activities, SOP preparation & assuring its implementation in related departments.
Managed Change control, CAPA & RCA Reports, and Deviation; prepared qualification documents DQ, IQ & OQ; maintained daily operations and preventive / breakdown maintenance records as well as other inventory.
Prepared summary/cost comparison sheet for utility projects & operational work, Engineering Drawing & modification if required by A.M & D.M also responsible for engineering utility system drawings.
Ensued Cost controlling & value addition in utility projects & operational work. Understand & responsible to ensure environment, health & safety laws & regulations for accepted safe work practices
Planned and executed Project and included machine maintenance & operations of air compressors, HDD Hydraulic machine, Hydraulic Excavators, pipe layer machine, hydraulic & mechanical cranes, reciprocating pumps, water feeding pumps, multistage pumps, reciprocating & screw type compressors & power generators, etc. Ensured the issue, the validation, and the maintenance of the project equipment lists and other engineering documents as applicable to each project. Ensured effective technical coordination with the client's representatives as well as the technical part of the contract review.
Key Contributions:
Designed scheduled and execute the preventive / breakdown maintenance of the above-mentioned machine & equipment, also supervised the issue of engineering deliverables, and approves the key engineering documents.
Developed project plans led the design and safety reviews and supervises the follow-up of the outcomes, and worked on project material quantity & cost estimation with Drawings & Specifications.
Provided instructions to the engineering team through project engineering instructions and procedures, and contributed to Project reporting for the engineering part (activities, quantities, budget, and areas of concern.
An integral part of contract management by initiating, collecting and consolidating the variation requests and change orders as well as the risk management for the engineering concerns.
Actively engaged in project planning definition by providing engineering milestones and requirements as well as in the induction of the engineering team to contract/project requirements.
Led project planning, execution, material quantity, cost estimation, drawings, and specifications. Coordinated construction activities as well as conducted client assessments, meetings, documentation control, and presentations. Contributed to project reporting tasks for the engineering part, such as activities, quantities, budget, and areas of concern.
Key Contributions:
Guided the engineering team through project engineering instructions and procedures, ensured ISO documentation related to construction activities, and supervised the initiation and maintenance of project dossier.
Worked on design as-built drawings and ensured effective technical coordination with client's representatives.