Goal-oriented Industrial Engineer with 5+ years of experience in production and compliance of QMS, EMS, OHSAS and Utilities.Up till now i have improved my skills in production labour management, compliance of standards implemented lean tools.Currently seeking an opportunity in a well reputed firm and eager to utilize and enhance my professional skills for the betterment of the corporation.
· Ensuring Production Plans are fully implemented
· Ensure Quality Control of the product & process
· Ensure achievement of Production KPI’s (PPM, 5S, Wastage, Kaizens)
· Overall Equipment Effectiveness calculation and Implementation in plant
· Toyota Production System tools (JIT & JIDOKA) implementation in plant
· ISO 14001, OHS 45001 and ISO 9001 Implementation & Documentation
· Technical Reports and Presentation for higher management
· Improve Plant Visualization (Andon System, Standardized worksheets, Kaizen, 5S, Muda, etc.)
· Maintain standard as per set by Toyota Boshoku Japan
· Making sure that staff comply with all health and safety regulations
· Study and Implement QCC projects at the plant
· To monitor and minimize line side defects through RCCAs
· Managing and developing a production team through skill monitoring
· Support stock Audit (WIP, FG)
· Monitored and controlled consumption of utilities in machines
· Monitored heat exchangers, hot water recovery pumps
· Reduced overall steam consumption to reduce utility cost
· Worked on projects & tasks for energy conservation & sustainability
· Made analysis reports on consumed utilities & their costs
· Conducted steam trap audits
Employed as an Assistant Manager in Production Department. My job responsibilities includes:
• Ensuring the compliance of ISO9001:2015, ISO14001:2015 and OHSAS 18001
• Monitor, control & supervise work force
• Analyse capability and capacity of equipments by measuring Overall Equipment Efficiency (OEE)
• Analyse processes via time & motion study and lean techniques for continuous improvement
• Plan & implement routine maintenance
• Perform Root Cause Analysis (RCA) on rejected & reworked parts
• Implement daily Production Plan
• Attend production and Quality Review Meetings (QRM)
• Implementing lean tools & techniques for reducing MUDAS for continual improvement
• Conduct on job trainings & awareness sessions for workers
• Perform other tasks assigned by the Incharge/HOD
• Monitored ,controlled & supervised work force
• Conducted time & motion study
• Managed & supervised various projects
• Met the vendors regarding projects
• Perform other tasks assigned by the Production Manager