خلاصہ

Senior Engineering and Management Professional with a proven track record of driving operational excellence and achieving organizational goals. Leveraging extensive experience in planning, implementing, and optimizing solutions to enhance productivity and reliability. Adept at leading cross-functional teams, fostering a culture of innovation, and delivering projects on time and within budget. Known for exceptional leadership, motivation, and problem-solving skills, coupled with a commitment to quality and safety standards. Seeking to apply expertise in laboratory management, construction engineering, and project coordination to drive success in challenging environments.

پراجیکٹس

Suki kinari hydro power project

تجربہ

کمپنی کا لوگو
Site engineer E&M
China Gezhouba Mechanical and Electrical construction Co. Ltd
اپریل ۲۰۱۹ - موجودہ | Mansehra, Pakistan

Design review of construction drawings, coordination with consultant and client to expedite the project..
 Responsible for the installation/erection of all E&M equipment’s.
 Provide all the facilities to manufacturer to perform the E&M site testing..
Supervision of whole Mechanical Services Building & Control House Building Civil & Electrical Work.
Developed and implement maintenance strategies and schedules to ensure equipment reliability.
Monitor and analyze hydro-power plant performance and efficiency.
Responsible for ensuring the efficient and reliable operation of the plant. This includes overseeing day-to-day activities such as monitoring equipment performance,conducting routine maintenance of generator , stator, rotor.
Monitor excitation system, inspection of circuit breakers ,transformers and metering instruments on daily basis.
Responsible for conducting routine maintenance,troubleshooting issues,implementing safety protocols.
Working on GIS (gas insulated switch gear) and AIS (air insulated switch gear) these electrical substation equipment used to control and distribute electrical power.
Supervision of testing and commissioning of GIS and AIS. Testing includes dielectric test, resistance measurement of the circuits, tightness test, temperature rise check, pressure test on portion, low and high temperature verification's.
Supervision of rotor and stator testing like insulation resistance (IR), winding resistance, growler, phase balance, surge comparison, polarity and ball rotation test.
Routine maintenance and testing of excitation system. Self excitation and separate excitation systems. Excitation system supply and regulate the amount of D.C current required by generator field winding.

تعلیم

University Of Engineering & Technology, Taxila
ماسٹرز, ماسٹرز ان سائنس, Bsc electrical engineering‎
Electrical Power
2016

زبانیں

متوسط انگریزی