As a Site Engineer I am performing and supervising following jobs for AB CONTRACTING at SAR project.
Routine Maintenance:
• Routine visits of sites on regular basis in which my field staff cleans the generators from in-side and out-sides, clean the intake Air Filter.
• Check the oil level, battery fluid, coolant and top up if required. Run the idle generator and make sure both generators are in working condition. Take readings of running hours, temperature, oil pressure, voltage, amps, load (KVA), battery volts and record on log book available at the site as well as report back to Control Center of main contractor.
Preventive maintenance:
• Replace Oil with fresh oil, lube oil filter, fuel filter and fuel water separator filter, maintain the level of coolant and battery level
• Replaced fan belt and air filter if the condition is deteriorated otherwise after every six months these should be replaced.
• Check battery terminals and clean all corrosion, accumulation of anti-conduction elements.
• Check power, battery connections so that no loose connections remain.
Corrective Maintenance:
As soon as the any failure alarm is noticed in OCC, inform area supervisor about the failure and nature of alarm. The area supervisor will take immediate action to rectify the failure by sending team to the site and team will clear fault as early as possible (within 2.5 hours).
Testing & commissioning of genset of ATS & fuel tank:
Testing &Commissioning of Genset, ATS & Fuel Tank comprises on following.
Genset Testing:
• Start genset for 10 minutes and check output voltage & frequency.
• Check under speed shutdown & over speed shutdown, voltage shutdown & over voltage shutdown, oil pressure shutdown.
• Check over temperature shutdown, emergency stop shutdown, Start and stop genset in manual mode.
• Check alternator charger voltage and alternator charger amps, start and stop genset in auto mode, starter battery (Specific Gravity) of genset.
• Check auto change