To work in a creative and dynamic environment that provides excellent learning opportunities, and to be placed in a company in which I can use my skills and leadership qualities to uplift the company and personal growth.
TP 4G-LTE PROJECT
TELENOR PROJECT ROLLOUT
TP 3G OSS
TP ZTE-RMS ZNV (Remote Monitoring System)
TP POWER SWAP
TP 3G RF SECTORIZATION (Sector Splitting) and SECTOR ADDITION Project.
IPS (Integrated Power Supply) Installation at TP Sites.
Installation & commissioning of NEC IPASSO link series 200,400&1000.
Configuration of 4G-LTE site after installation.
Configuration of 3G site
Editing and uploading MO files.
ZTE Rectifier ZXDUW301 Installation and alarms verification.
ZTE Battery Bank ZXDU68 Installation.
ZTE SDR 8700,8700A&8900 installation.
Installation of ZTE made Fuel Sensor on fuel tanks.
To Check the VSWR, TX power, and Return losses by using Site Analyzer
and Power Sensor.
To Check the Status of all Boards and Modules of the BTS after power on.
Call test after completion of Commissioning.
Trouble shooting of RRU’s, FS cards through hardware and software.
HUAWEI UFONE 3G POWER OPTIMIZATION.
HUAWEI CMPAK RF EXPANSION PROJECT.
Installation of HUAWEI BTS3900(GSM),3900, 3012 & 3012 AE
Complete installation&commissioning of HUAWEI OPTIC RTN 900 Series
CMPAK 3G&MW LOS survey.
Huawei Power Equipment
HPS (Hybrid Power Supply)
MPS (Mix Power Supply)
TP 48200 / TP48300
ICC 310 & 330 Rectifier system