AOA, dear sir;
My name is Hafiz Asad Habib, I have done Electrical Engineering from
Riphah International University Islamabad (RIU). Al_hamdulilah
achieved a GOLD MEDAL in my Bachelor's and I am ( PEC ) registered
Engineer and I have a constructive amount of professional Experience
for almost 2 years at FMCG group.
I have experience in the field of Electrical power designing for low
voltage Switchgear and Distribution DB as per recommended IEEE/IEC
standard and also did the different projects regarding PLC
/controlling panel in different plant projects which I have mentioned
in my CV.
I have also good communication skills in verbal/nonverbal, confident
presentable attitude toward the audience. And good skills in MS Office, Excel, and visual management tools used for managing purposes.
I have mentioned all my achievements, experience, and skills in my CV.
I believe that this job will be a good learning platform for me, but
I ensure that my skills, hardworking capabilities, and passion to
learn new things will be an asset to your company as well.
NOW a day I am doing a job at GHANI GLASS LTD leading in FMCG group since May 2019, as an ELECTRICAL ENGINEER. Where my domain of work is to manage the department under the given circumstances and under given resources and regularly deal with the DG generator, transformers, Switch gear, heavy motor, blowers, I.S machine Controlling, soft starter, VFDs, and PLC ladder programming/HMI.
Secondly, regularly calculate the total load of the plant and maintain the log sheet for taking the vice decision to improve the efficiency of the plant at low cost. Also maintain the documentation record of electrical schematic, installation of all equipment and operational problems , used and reused resources. I am also the part of Energy committee and utilize my R&D skills to improve and manage all the resources to provide cost effectiveness and more feasible projects to factory for the better performance
Working as a Maintenance Engineer in two different departments:1) Electrical Department :To troubleshoot different problems that arise in the building.Like: DB panels, motor pumps,LT panels etc. Installation of ATS for generation and wapda Monitor the generation consumption Monitor the Wapda consumption Daily preventive maintenance1) BMS on HVAC :To provide maintenance regarding control system of HVAC Installation of VFD for controlling C.PUMP Installation of pressure flow meter Preventive maintenance for cooling tower
My job at PTCl as an Interne. different type of assignments has been given to me by my supervisors in different departs.
1)I did work on (MSAG) multi-services access gateway in Fiber optics field department.
2)I did participate in the strategical and operational planning for the enhancing the product and services of the company.
3)I also did work for checking the error message in wireless and convey a message to the field manager for solving the problem in wireless communication and facilitate the user.
4)I have worked on four different departments,
power
optical fiber
network
wireless department