خلاصہ

I am an electrical engineer with not having the only engineering degree but with the skills I got by solving daily life problems using Engineering Ideas. I never tired of trying. I always try different possible approaches to solve problems and I try my best until I succeed. I never left anything unsolved and I take these unsolved problems as challenges and succeeded in solving them 95% of the time. This is not due to only the skills but my aim and spirit of trying and trying which enables me to solve them. I had a great experience to deal with teamwork as a group leader in final year project. Working with team to achieve goals in cooperative passion and environment

پراجیکٹس

Wind PV hybrid system

تجربہ

کمپنی کا لوگو
Course Instructor
IICC
نومبر ۲۰۱۸ - موجودہ | Lahore, Pakistan

Primavera P6 trainer
Etap Electrical Design
Ethical Hacking Trainer
Web-development
Computer Foundation
Mathematics
Physics etc....

کمپنی کا لوگو
Electrical Engineer
Triangular LLC (Looking for Good Opportunity)
مارچ ۲۰۱۸ - جون ۲۰۱۸ | Abu Dhabi, United Arab Emirates

Working as an Electrical Engineer in World Largest Solar Power Plant 1177MW.

کمپنی کا لوگو
Proposal and Design Engineer
Flowtronix(DDFC group) pvt ltd
مارچ ۲۰۱۸ - مارچ ۲۰۱۸ | Lahore, Pakistan

Capable of making complete proposal documentation for Electrical and
Instrumentation Projects.
Extracting the quantities from the drawings, if no BOQ is provided.
Basic working for man-hours and price calculation for man-hour rate. .
Understanding of Record keeping of Proposals and Clients.
Excellent at communication with Client and Suppliers.
Proposal ISO audits.
Site visit after and before bid
Pre Project Execution Working
Prepared Technical bid Document for ICI Soda Ash Project
Prepared technical bid Document United Energy Pakistan (oil &gas ) Project

کمپنی کا لوگو
Trainee/interni
Sapphire Electric Company Ltd.
اکتوبر ۲۰۱٦ - مارچ ۲۰۱۷ | Muridkay, Pakistan

Worked With General Electric Team
Operation and maintenance of Power Plant (GT & ST).
Study of startup of 76MW G.E frame 6FA+e gas turbines and Skoda Steam turbine.
•Collaborated With Electrical and Instrumentation Department
• Study of Electrical Single line diagrams.
• Study of auxiliaries involved in a CCPP & their operation.
• Continuous monitoring of different plant equipment’s including Gas turbines and their
accessories, steam turbine and HRSGs and BOP.
• Operation & Maintenance of 132KV switchyard equipment
• DCS (Distributed Control System) SIMATIC PCS 7 and Mark-VI Control System for GE Gas
Turbines.
•Collaborated with HSE department
•Worked in Shutdown with AEPL Team

تعلیم

University of Management & Technology (UMT)
بیچلرز, بیچلرز ان سائنس, Electrical Engineer‎
Electric Power and Control System, Industrial Control and Automation
CGPA 3.2/4
2016

پیشہ ورانہ مہارتیں

ابتدائی Civil Planing
ابتدائی Handling Assignments
ابتدائی LTN
متوسط PV Design Knowledge
ماہر RESTful APIs

زبانیں

متوسط انگریزی
ماہر اردو