I am an accomplished construction management executive with proven success spearheading large-scale projects within budget and time constraints, such as land development, infrastructure, and buildings. Skilled at directing the entire project life-cycle stage including coordination with key stakeholders to achieve project milestones targets. Capable of collaborating with senior authorities and other teams to carry out complicated tasks to boost up project progress. Proven ability to build long-term working relationships and motivate construction teams, while maintaining high standards of work. Demonstrate ability to manage the development, implementation, and maintenance of effective management information to develop project resources effectively.
My key skills include Quality Assurance/Control, Horizontal Construction, High Rise Buildings, Project/ Cost Controls, Motivational Leadership, Site Management, Risk Management, Process Improvements, Planning & Scheduling, Excellent Communication, Project Management, Technical Skills, Critical Thinking, Data Interpretation and Resource Management
Attached is my CV which showcases my progressive experience and successful track record for leading successful initiatives. My professional background and great industrial exposure coupled with an excellent track record makes me an ideal candidate for executive roles. As such, I would welcome a discussion regarding opportunities with your organization that fit my background.
§ Progress of work is monitored through project scheduled and it remained in continuous discussion regarding its implementation with Contractor.
§ Coordination with key stakeholders like designers in order to run the project smoothly and flawlessly.
§ To prepare and continuously monitor the financial budget of the projects.
§ To make sure that every work should be documented and every activity at site is performed and checked by Inspection Request which is raised by the Contractor overnight.
§ Keeping an eye on the material wastages and ensuring zero wastage especially for steel rebars. In order to control the wastage of steel, Bar Bending schedule is prepared before start of any activity and every effort to make wastage minimum is taken even, we took designer onboard and get feedback from him.
§ Ensuring the quality control at each level of the activity by frequent visits, guiding the supervisory staff and interaction with the contractor closely and above all making sure the presence at the time of major pouring activities throughout the pouring time.
§ To control the quality, strict measure is being taken and in case of any deviation from standards, drawing and specification is found site instruction and Non-Conformance report is issued accordingly.
§ Ensuring the safety at site and giving safety awareness to the workforce during site visits and delivering lecture during morning assembly.
Key Project: Penta Square Project DHA Phase 5 Lahore (Construction of six mix used towers including apartments, offices and commercial, max of which having sixteen (16) stories in addition to 3 basements and Ground floor)
Key Project: Construction of Danish School Peer Mahal (Construction of Danish school includes two academic blocks G+1, Library block G+1, Multipurpose Hall, and a Admin block)
Successfully administer daily operations while managing resources, engineers, facilities, contractors’ personnel, system completion records, KPI, progress tracking reports, quality review and surveillance. Actively liaise with client, contractor, and design team to oversee finishing and structural tasks of the project and complete all functions in an efficient manner. Examine daily activities and inspection requests by the inspectors and provide guidelines to the staff for current and future activities.
• Skillfully identified, analyzed, and resolved all complex issues through daily communication with materials employees and field personnel.
• Steered progress review meetings with contractors to discuss problems and formulate, retain, and deliver monthly progress report to the management in a timely manner.
• Directed site visits on daily basis to analyze progress and quality of work, manage tasks, and ensure safety at site while following QA/QC manuals, drawings, and specifications.
• Improved operational output by conducting quality assurance analysis for construction related tasks.
Key Project: Construction of “Bahria Golf Resort Hotel Islamabad” (Construction of Five-star hotel at Bahria Golf City Islamabad having 7 basements for parking, back of house, storage facility and generator room and 9 floors of tower building containing guest rooms.)
Oversaw daily activities and inspection requests of inspectors and presented reports to the senior management. Facilitated Project Manager in managing duties as per requirements of the project and producing shop drawings, method statements, and transmittals for various ongoing site activities. Analyzed daily and monthly reports of the contractor while verifying IPC of the contractor on daily basis.
• Recognized and determined various issues occurs during execution of work via close collaboration with the client, senior management, designer, and contractor.
• Directed and supervised the construction process from conceptual development stage through final construction and handover to completions on a timely and economical basis.
Key Project: Construction of “New Islamabad International Airport” Pakistan (Construction of New Airport in Islamabad to facilitate passengers under one roof, including passenger terminal building, runways, air traffic control tower and all other infrastructure facilities) for Civil Aviation Authority Pakistan (Client)
Designed and supervised interface control management procedures, and interacted with stakeholders to generate time and cost implication documents for client approval. Delivered first-rate support to the Project Manager in managing various duties and revising technical and financial bids of the contractors while following project requirements.
• Established and evaluated contractor construction policies for accuracy, supervised contractor performance and highlighted any concerns to line manager for resolution.
• Presented recommendations to inspectors to analyze daily activities and inspection requests and evaluate shop drawings, method statements, and transmittals for different activities.
• Gathered and provided data by working with cross-functional teams to perform quality investigations and improve quality performance through initiating corrective and preventative actions.
Project: Saudi Arabian National Guard Housing Project Dammam (Construction of 750 Villas for soldiers and officers, Road construction, Infrastructure work including culverts, water supply, sewerage line, storm water line, landscaping, and hard scaping) for Saudi Arabian National Guard (Client) | Cost: 960M Saudi Riyals
Oversaw spreading backfilling material for roads and villas, infrastructural works, steel reinforcement work for the structure, inspection and concreting of villas’ tunnel formwork, and post concrete activities at the site. Discussed all technical issues/problems at site and safety by conducting project coordination meetings and facilitating with the senior management. Oversaw and revised material inspection requests as per project specification and shop drawings of steel reinforcement and determined technical issues/problems at site and safety and deliver progress to the management.
• Prepared and revised QA/QC manuals, method statement, site observation notes and non-conformance reports and delivered solutions and closing NCR after rectification of work.
• Functioned in close collaboration with site and core team/management to examine approval submittals, MIRs, and any onsite issues and maintain record of contractor’s progress.
• Streamlined engineering and project management-related processes and procedures that increase productivity levels and improve project bottom-line.
Key Project: King Abdullah Financial District (KAFD-B) PPA-10 (4 Multi storey building shaving 4 basements for Car parking each and G+32 storeys max) for Rayadah Investment Company (Client)
• Inspected steel reinforcement works while managing concrete pouring and post concrete activities at the site.
• Produced and reviewed work as per specifications, project QA/QC manuals, shop/built drawings, site observation notes, and non-conformance reports.