Over 2 years experience as a Design Engineer in oil and gas sector, I am capable of;
-Designing Piping Systems
-Development of Equipment Arrangement and Layouts
-Piping layouts
-Piping Specifications
-General Arrangements Drawings,
-2D Drawing
-3D Modeling
-3D modeling of skid mounted equipment
-Process Plant Facility
-Review of process package
-Giving inputs to civil, vessel, electrical / instrumentation groups for various purposes
-Piping Isometrics
-Piping Support Drawings
-BOM/BOQ Calculations
-Piping/equipment Erection and Line Tractability (Procuring Materials, Scheduling Activities, Monitoring Installation, Overseeing Maintenance)
-Procurement assistance
-Preparation of drawings for statutory approvals
-Preview of vendor drawings
-Inquiry Handling and Preparation of Techno-Commercial Proposals against ITB(Invitation to bid) document
Responsibilities
- Piping Design System
- Preparation of plot plan, equipment layouts piping studies, piping specification;
- Review of process package;
- Giving inputs to civil, vessel, electrical / instrumentation groups for various purposes
Goes Through
- Preparation of piping layouts, isometrics, support Drawings;
- Stress analysis
- Procurement assistance
- Preparation of drawings for statutory approvals
- Preview of vendor drawings;
- Coordination with various engineering groups & site.
Activities
- 2D Drawings
- 3D Modelings
- General Arrangement Drawings
- Generation of Isometrics
- Modeling of Skid Mounted Equipment
- Process data required converting P & ID’s to piping layouts like a proper identification of valves, strainers, In-line instruments,
- Utility summery giving utility consumption for each equipment with duty conditions like pressure, temperature etc.,
- Conceptual equipment layout drawings for process plant reflecting the process constraints.
- Process data sheets for equipment
- Hazardous area classification etc..
- Review of drawings for machinery & other brought-outs
- Review of drawings for special piping items
- Specification for insulation & painting of equipment & piping items
- Updation of P&ID’s based on detailed engineering,
- Scheme for the erection of equipment in consultation with site engineer