I am Civil Engineer experienced as a,
1) Project Engineer,
2) Quality Control and Quality Assurance Engineer
3) Surveyor,
4) Quantity Surveyor / Estimation Engineer,
5) Site Engineer and Supervisor, and as an
6) Architectural and Structural Draftsman
I Worked in,
a) Residential, Commercial and Industrial Buildings
b) Villas
c) Shopping Mall
d) Slaughter House
e) Roads
f) Sports Complexes and Grounds
g) Transmission Lines and
h) Sewerage/Drains System, etc. with Finishing.
I also have Strong Experience and Expertise of Constructing Sports Complex (Working with Chinese and Koreans) including
1) Hockey, Football and Cricket Grounds
2) Running / Jogging Tracks and Cycle Tracks
3) Tennis ball, Basketball and Volleyball Courts Construction.
4) In-Door Gaming Gymnasium and Open Gymnasium.
5) and Swimming Pool and Pavilions etc.
The Details are mentioned in attached CV.
Regards
Engr. Kamran
Construction of,
1) SPORTS COMPLEX Including
FOOTBALL GROUND, SWIMMING POOL, TENNIS COURT, BASKETBALL COURT,
VOLLEYBALL COURT AND OPEN GYM AND JOGGING, RUNNING and CYCLE TRACK.
2) MECHANICAL INDUSTRY
3) TRANSMISSION LINE POLES, FOUNDATION and FIXING
4) RETRO-FITTING and REPAIR IN BUILDINGS and VILLAS
5) ROADS and SEWERAGE LINE
Responsibilities:
Preparing of Project Plan to Complete the work within the given time period
Site Supervising and Leading the Project according to Plans
Checking Layout, Level and Slope of the Grounds, Swimming Pool, Running Track, Cycle Track and Courts
according to International Standard
Concrete Spreading and Perfectly Leveling according to Required Standards
Constructing Concrete Slabs On Grade and Concrete Floors with High Standards
Constructing Tennis Court and Basketball Court according to ITF and FIBA
Applying Acrylic Paints on Courts according to International Standards
Preparing IPC from the given Drawings and BOQs
Preparing Procurements Plans
Construction of Villas and Slaughter House according to given approved Drawings and with in given time
period
Construction of Hockey Ground in Bannu Dist.
Preparation of Project Plan to Complete the work within the given time period
Site Supervising and Leading the Project according to International Standards
Checking Layout, Level and Slope of the Ground, and Matching all Measurements with the FIH Rules
Asphalt Spreading and Leveling for supporting Shock-Pad and Turf
Laying of Turf on the Ground According to International Standards
Making the Ground comfort to be fit for Hockey and confirming by the FIH Team
Preparing the Estimation/Costing of Materials from the given Drawings and BOQs
Preparing Procurements Plans