In search of a challenging and responsible position in a telecom organization . Desire to join a progressive organization where my capabilities will be enhanced and appreciated with the ultimate objective of the organization’s mission.
SKILLS:
I have two years hands on experience how to implement the cell tower ,3G,4G survey,sectorization survey,solar survey,area proposed for the new roll-out site,LOS survey,installation of Microwave Dish and proposed the height for it.MO file uploading in BBU through login IP address.
I have the experience of Networking and done the CCNA & MCSE .
Experience of SERVER 2012 r2.
How the ACTIVE DIRECTORY work, and make the data base of user in AD and also maintain the OU(organizational unit) as well,Making of user Accounts.
Implementing policy as well.
DHCP,IIS Manager, DNS installation and how to fully qualified it. WDS, FTP Server.
Protocol experience ACI,OSPF,EIGRP.
Working as a site Engineer in EDB company .
Surveys for 3G OSS,4G LTE and 4G sectorization .
Ufone Rollout survey ,Telenor Rollout survey,LOS,
ZONG Rollout survey .
Telenor & ZONG Solar Survey.
And making of different Layouts for these Rollout surveys.
Proposed PAD area for shairing the one operator with another operator.
RF planing Survey.
New built site survey on base of Dumpy level and total machine.
• TI(Tower Installation)
• Solar Installation
• RMS Installation(Remote Monitoring System)
• LOS (Line of Site) Survey.
• Installation (Full Rack) of ZTE indoor & outdoor BTS with different configurations
• Installing and design different ZTE BTS like W301,W001 and SF01
• MO file uploading to BBU (B8200)
• Assembling and Installing GSM Antenna’s HUWAEI900 and1800(Dual Band Antenna)
• Installation of Different RRU Models(8881, 8882) And Its Looping With GSM Antenna’s
• Both 2G&3GInstallation
• Routing and Cabling
Link Experience:
• Installation of Microwave Antenna (Antenna Size 0.6,0.9, 1.2, 1.8)
• Linking and Alignment of Microwave Antenna’s
Microwave Commissioning
• Work on both 1+0and 1+1Links
RMS (Remote Monitoring System) Experience
• Installation of ZTE RMS
• Commissioning of ZTE RMS
Experience in Power
• Installation of Solar Panels using ZTE Charge Controllers
• SHOTO Battery Bank Installation (600mah, 800mah, 1000mah) with alarms GLO Hi temp, GLO Door Open, Smoke alarm.
• DC Charger Installation
• Generator Power
• Good Experience of Both SA (External Alarms) &SE (Internal Alarms) Alarms
• Alarms Patching, Alarms Generation and Alarms Removing
• Good Experience of Doing Quality Of The site.