I am BSC Degree Holder in Electrical Engineering having 8 Year MEP Experience in Designing, Installation, Testing, Commissioning of RMU,Transformer,Electrical HT Panels,LT Panels,DBs,Feeder Pillar,Firefighting System,HVAC/VRF System,Fire Alram System,Public Address System,CCTV System,Networking,Water Supply System,Irrigation System, Estimation, Billing, Supervision and Site Management in Private/Govt/Residential/Commercial Building and Infra Structure Project
•Reviewing and Supervision the time schedule for the implementation of MEP works in coordination with other related engineering works (Structural - architectural – Mechanical, Cost Estimation,PC-1 and Tender Documents for different MEP Works. •Installation, testing and commissioning of 6 x RMUs, 2 x 400 KVA ,6 x 200 KVA Transformers With 60 Dbs and 10 Feeder Pillar. •Installation, testing and commissioning of Water Supply and Irrigation HDPE Pipe Line of 500mm,355mm,250mm,225mm,160mm,90mm,75mm,50mm,32mm with Gate Valve, Air Valve, Washout Valve, Fire Hydrant and Water Connection. •Installation of Upvc 6inch and 8inch Pipe for Sewarage System •Inspection ,Supervision and Ensuring that the implementation of MEP works on site is according to the technical specifications, Standard and as per Drawings. •Electrical Supply Arrangement to site Wapda and Generator for execution of Different site work •Supervision & Inspection of installation of Lights, Switches , Socket ,Distribution Board, Main Panel Board, CCTV System , Public Address System , Telephone System, Fire Alarm System ,VRF System & Fire Fighting System With Approved Specification and Drawings •Supervision & Inspection of Solar Cylinder Lights, Plates Lights and Solar Plant for Tube-well. •Calculation of Daily Activities for Implementation of Work Schedules. •Preparation of Demands for Material Required on Site. •Checking & Verifying IPCS submitted by Contractors with Site Measuring Sheet ,BOQ and Drawings
•Preparation of Project Brief for Management.
•Coordination with Designer in Designing Phase as per the Project Requirements
•Preparation of Engineering Estimate for MEP Works
•Preparation of Bidding Documents
•Verification of IPC submitted by Contractor with Measuring sheets, and Boq
•Approval of Submittal of All Mep Equipment's
•Supervision and Inspection of Installation of Switch, Socket, Lights and DBs with approved Specification and Drawings.
•Supervision and Inspection of installation of Transformer
, Generator, HT Panel and LT Panel.
•Design , Supervision and Inspection of Installation of Tube-Well Pumps
•Supervision and Inspection of Installation of Public Address System, Fire Alarm System, CCTV System & Communication System with Approved Specification and Drawings
•Meeting with Client, Sub-Contractor and Stake Holder
•Verification of Rate Analysis for Non-Boq Items
•Preparation of Weekly and Monthly Progress Reports
•Keeping the Contractor In/Out & Client In/Out Letter and other office record of all Project
Design,Cost Estimation, Installation, Testing & Commissioning of Solar
•On Grid System
•Off Grid System
•Hybrid System
•Solar Street Lights
•Solar Express Way Road Lights
•Lead Acid Battery
•ON-Grid, Off-Grid, Hybrid Inverter
•Solar Pumps Plants
•Web Server, Email configuration, Troubleshooting and Keeping Records. Installation of New Operating System, Microsoft Office, Configuration of Outlook and Providing help in Office, Word, Excel, Adobe Photo Shop, In page and Outlook
•Video Conferencing, Audio Call Conferencing Through Skype, GoToMeeting, Zoom, Adobe connect Setup and Organizing.
Procurement ,Maintenance and
•Installation of General Wiring of Switch, Socket, Main Circuit Board, and Main from Board to DB.
•Layout and |installation of Conduits for Lights, Low Current System & For Main Power Cable from HT ,LT and MPB to DBS.
•Installation of CCTV Camera, NVR and POE Switch.
•Installation of Public Address System.
•Installation of Earthing for Building, Transformer and Generator.
•Installation of DBs, LT Panels