خلاصہ

a) Main Responsibilities:
1) Manage and direct building supervisors, contractors, or design professionals to discuss and resolve matters, such as work procedures, complaints, or construction problems related to Civil engineering including Electrical, plumbing, HVAC and allied fields.
2) • Schedule the project in logical steps and budget time required to meet deadlines.
3) • Prepare contracts and negotiate revisions, changes and additions to contractual agreements with architects, suppliers and contractors.
4) • Prepare and submit budget estimates, progress reports, or cost tracking reports.
5) • Analyze survey reports, maps, drawings, blueprints, and other topographical or geologic data to plan projects.
6) • Interpret and explain plans and contract terms to administrative staff, workers, and clients, representing the department.
7) • Plan, organize, or direct activities concerned with the construction or maintenance of structures, facilities, or systems.
8) • Take actions to deal with the results of delays, or emergencies at construction site.
9) • Inspect or review projects to monitor compliance with building and safety codes, or other regulations.
10) • Study job specifications to determine appropriate construction methods.
11) • Select, contract, and oversee workers who complete specific pieces of the project, such as painting, plumbing, A/C, elevator.
12) • Supervise projects and task through CBM portal and ensure correct data entry from all users.
13) • To liaison with finance, MMD and other group service department to get timely services.
14) • Involve in hiring, training and other HR related activities.
15) • Any other assignment(s) given by management time to time.

تجربہ

کمپنی کا لوگو
Sr. Manager construction
Independence Media Corporation
نومبر ۲۰۰۳ - موجودہ | Karachi, Pakistan

Handling Construction and maintenance department and reporting directly to Executive director Real estate. This department is facilitating to 3000 users and maintaining civil, wooden HVAC,Elevators and electrical ups and genset supply to 300,000 Sft construed office area.

کمپنی کا لوگو
Finishing Engineer
Builder associated on MCB Tower Karachi (Pakistan Highest building)
نومبر ۲۰۰۱ - نومبر ۲۰۰۳ | Karachi, Pakistan

a) Start and completion of Masonry & Plaster Work
i) Prepared Mock-up of wet area
j) RCC Foundation of boiler, turbine & electrical panel
k) Whole Finishing items including toilet tiles, floor tiles and other finishing of tower.
l) Completed finishing works from basement to 23rd floors

کمپنی کا لوگو
Site Engineer
Builder Associates on Pakistan Housing Project (Contract # PHA – 019)
اکتوبر ۲۰۰۰ - ستمبر ۲۰۰۱ | Karachi, Pakistan

 Assignments
a) Structural Works – In structure work I have to execute the following activities:
• RCC Foundation
• Brick Masonry
• Formwork
• Rebar Fixing
• Concrete of Foundation and roof slabs
b) Finishing Works – In finishing work I have to execute the following activities:
• Plastering
• Flooring
• Ceramic Tiles
• Plumbing, Sanitary Fittings & Fixtures
• Finalized sub-contractors bills

تعلیم

Indus Institute of Higher Education
بیچلرز, بیچلرز ان ٹیکنالوجی, B-tech Civil (Pass)‎
Civil
CGPA 3.5/4
2008

پیشہ ورانہ مہارتیں

ماہر Machine Program Handling
ماہر Noticing Malfunctions

آپ کن کمپنیز کی پیروی کر رہے ہیں