• Member Institute of Electrical & Electronics Engineers Pakistan (IEEEP) S-944.
• Member Pakistan Engineering Council (PEC), Pakistan Elect-40872.
· Thesis on “Fuzzy Controller Design for Synchronization of Micro Grid with Conventional Grid for Power Stability” for the completion of “M.S Electrical (Power)” Degree.
· Term Paper: Balancing Reliability with Cost, Energy Production through Fuel Cell in Pakistan & Analysis of the Utilization of Solar House in Rural of Gansu.
· Survey Paper: Control Strategy for Cascaded Medium – High Voltage STATCOM, High Power Transformer-Less Photovoltaic Inverter & Opportunities and Challenges of Integrating Renewable Energy in Smart Grid System.
· Relevant Coursework: Power Quality, Reliability & Planning, Alternate Energy Resources, Power Circuit Breaker & Substations, Research Methods, High Voltage Engineering, Power Electronics, Smart Grid System Operations & Advance Control Systems, Power System Protection, Engineering Project Management, Technical Writing, Physics, Calculus, Numerical Analysis, Electro-Mechanical Systems, Engineering Economics, Power System Analysis, Signal & Systems.
· Final Year Project: 3-Phase Pure Sine Wave Inverter.
· Research Paper: Design of Small Standalone PV Solar Energy System.
· Seminar: Application of Clean Development Mechanism (CDM) on Renewable Energy Projects organized by IEEEP on 30th April, 2014 in WAPDA Auditorium, WAPDA House, Lahore.
· Continuing Professional Development (CPD) Lectures organized by IEEEP and PEC.
· International Conference on Engineering & Emerging Technologies (ICEET) presented Research Paper on “Design of Small Stand-Alone PV Solar Energy System” on 20-21st March, 2014, Superior University, Lahore.
· Internship Report: Renewable Energy Resources in Pakistan.
· Organize arrangements for mobilization.
· Lead the team of Sub Engineers to ensure a timely output with quality and according to the schedule.
· Establish and maintain close liaison and coordination with all stakeholders regarding Project activities.
· Prepare Monthly Progress Reports.
· Verification of Invoices submitted by the Contractor.
· Review as Built Drawing prepared by Contractor.
· Review the Punch List before submission.
· To ensure adherence to safety standards in compliance with the rules & regulations of various statutory bodies.
· Ensure that adequate arrangement has been made by Contracts at the site for the safety of workers.
· Monitor the Schedule for material procurement offered by the contractor, delivery, and installation progress, and submit the report to the client.
· Develop a comprehensive project work program and implementation schedule.
· Monitor project progress against plan, report on progress, and propose remedial measures as necessary.
· Testing of 132 kV Grid Station Equipment (Battery Bank, Battery Charger, Control & Relay Panels, Synchronous Panels, etc.).
· Evaluate technical data/drawings for substation equipment to confirm compliance of NTDC design parameters/specifications.
· Preparation of cable lengths (through drawings and auto cad for interconnection of panels and equipment) and estimate of material i.e., conductor and accessories.
· Inspection of Electrical & Civil Works for 220kV/132kV GIS Ghazi Road Grid Station.
· Preparation of Completion Report for 220kV/132kV GIS Ghazi Road Grid Station.
· Commissioned Different Grid Stations for QESCO, FIEDMC & TESCO.
Assure smooth operation of maintenance of powerhouse gas generator.Check, test, and maintenance of L.T/H.T panels, generators, transformers, etc.List down necessary records/readings i.e., reactive power, power factor adjustment, kilowatt-hours, etc.Check and assure uninterrupted machine operation in the kitchen and laundry. Confirming smooth operation.Trouble-free operation of lifts.Check and maintain uninterrupted power supply (U.P.S) to medical equipment (cobalt, linearaccelerator & C.T. Scan).Assure preventive measures for standby generators, operation, and supply systems.Perform tests on the control panel of the fire alarm system confirming the system's effectiveness.Assist all kinds of maintenance works.Conduct training sessions for junior electrical operation and maintenance staff.
Testing/Commissioning of 132 kV Grid Station.Preparation of BOQs from Single Line Diagram of Substation/Grid Station.Evaluate technical data/drawings for substation equipment to confirm the compliance of NTDC designparameters/specifications.Assist in Tender & Bid Evaluation of Grid Station Equipment.Preparation of coordinates (transmission line towers of 132kV and 220kV) from the points given andestimate of material i.e., conductor and accessories.
Site engineer, Punjab Safe City Project; inspection, jointing & labeling of cables, accessories checking of hand and main holes, verification of cable length of 16, 48 & 96F, checking and re-verification of civil and electrical works of poles, cameras, out pits, cables and other gadgets, etc.Check the physical works as per the AutoCAD Drawing, and omissions got rectified by the contractor.
Collection and analysis of unit prices of material & equipment of 220kV/132kV substation and 220kV transmission line.
Assisted in the estimation of project cost i.e. electrical material and equipment, civil works, erection, and commissioning.
Assisted in the technical design of 220/132 kV grid substation & 220kV transmission line.
Checking and supervising of construction of 220/132 kV grid substation & 220kV transmission line.
Stat. as depicted under SHMC, and
· Assist in the preparation of bidding documents.
· Check/scrutiny of bidding documents as per the ADB guidelines.
· Prepare Bid clarification note to the Bidder.
· Assist in Bid Evaluation.
This work was carried out in respect of the Power Transmission Enhancement Investment Program (Tranche-IV) under the Asian Development Bank (ADB), loan no. 37192-044 PAK.
· Collection and analysis of unit prices of material & equipment of 132kV substation.
· Assist in estimation of project cost i.e. electrical material and equipment, civil works, erection, and commissioning.
· Assist in technical design/single line profile of 132 kV grid substation.
· Check construction of 132 kV grid substation as per the Drawing.
· Educational visit to Manufacturing concerns: PEL, TRANSFOPOWER, TRANSFAB, KBK, CREATIVE Group of Companies & ELMETEC.
· Got acquaintance with the manufacturing of Power Transformers, Distribution Transformers, 11kV Distribution Panels, Switch-Gears for Power Distribution System, Energy Meters, Current (CT) & Potential Transformer (PT), and also Cable Manufacturing Factory (FAST and Newage).
· 15 days at NTDC System Protection department to learn theoretical concepts relating to Electrical Protection Gears i.e. Relays, Circuit Breakers & Batteries.