Responsibilities:
• To assist Manager in Administrative and Technical matters pertaining to installation and Maintenance of Grid station Equipment.
• To carry out tasks/ jobs assigned by manager/ DGM.
• Ensure preventive maintenance and trouble free operation of equipment installed in grid station.
• Ensure timely rectification of faults, repair/replacement of faulty equipment.
• Develop and execute Annual Preventive Maintenance program for grid station.
• Coordinate for uploading of grid data on SAP.
• To provide technical guidance and instructions to lower staff.
• To plan replacement of obsolete/faulty equipment and ensure availability of necessary spares.
• To remain on call 24/7 and ensure quick response incase emergency/breakdowns.
• Inspection and testing of new equipment procured by the department.
• Ensure implementation of Safety Guidelines and co-ordinate with HSEQ.
• Arrange sessions and trainings for employees regarding latest company policies and SOPs.
Working Experience on Special Projects:
• An overall working experience of 7 months on the rehabilitation of 220 kV & 132 kV GIS grid stations with Hitachi Japan and ABB Sweden teams respectively.
• 2 months working experience with Hitachi Japan team in the rehabilitation of 220 kV GIS grid station. Incharge for overall gas handling of GIS switchgear and maintenance work during the rehabilitation.
• 5 months working experience with ABB Sweden team in the rehabilitation of 132 kV GIS grid station. Incharge for overall gas handling of GIS switchgear and maintenance work during the rehabilitation.
Responsibilities
• To assist Manager in Administrative and Technical matters pertaining to installation and Maintenance of Grid station Equipment.
• To carry out tasks/ jobs assigned by manager/ DGM.
• Ensure preventive maintenance and trouble free operation of equipment installed in grid station.
• Ensure timely rectification of faults, repair/replacement of faulty equipment.
• Develop and execute Annual Preventive Maintenance program for grid station.
• Coordinate for uploading of grid data on SAP.
• To provide technical guidance and instructions to lower staff.
• To plan replacement of obsolete/faulty equipment and ensure availability of necessary spares.
• To remain on call 24/7 and ensure quick response incase emergency/breakdowns.
• Inspection and testing of new equipment procured by the department.
• Ensure implementation of Safety Guidelines and co-ordinate with HSEQ.
• Arrange sessions and trainings for employees regarding latest company policies and SOPs.
Achievements
• Performance based Promotion from Trainee Engineer to Assistant Manager within a Year.
• Supervised and trained staff on Gas handling of Gas insulated switchgear.
• Representative and coordinator from the department in implementing SAP in Transmission department of K-Electric.
• Understanding the maintenance work on switchgears at Grid station and leading the team during the maintenance work at Grid station.
• Observing and doing Load Dispatch and unit commitment at Load Dispatch Centre of K-Electric
• Extensive working knowledge of Gas Insulated Grid station because worked in Overhauling of 132kV Gas Insulated Grid station (Pipri West, one of the Grid station at K-Electric (7bays)) mainly SF6 Gas handling during the maintenance work with ABB, SWEDEN team for 4 months from December 2016 to March 2017.
• Worked in Overhauling of 220kV, Gas Insulated Grid station (Pipri West, one of the Grid station at K-Electric) mainly SF6 Gas handling during the maintenance work with HITACHI, JAPAN team for 1.5 months from June 2017 to July 2017.
• Completed a Project on Trend Analysis for Predicting the Lifetime of Power Transformers being used in K-Electric.
• Carried out Operation & Maintenance activities on MV switch gear including Preventive Maintenance, Testing and Troubleshooting of faults in MV Switches.