GIVE MAXIMUM OUTPUT ON MINIMUM INPUT
EXCEL IN THE PROFESSIONAL FIELD AND GROW WITH THE ORGANIZATION
• Currently dealing with hydel projects, which are under development and having capacity greater than 50 MW.
• Negotiations of power purchase Agreement of Hydel projects.
• Negotiations of Power purchase agreement and tariff of hydel power projects in AJK, as these projects are not within the jurisdiction of NEPRA.
• Prepare Power Acquisition Requests of power projects.
• Comments on tariff petition of hydel projects in NEPRA.
• Attend tariff hearing of hydel projects in NEPRA.
• To attend meetings of Panel of Experts in PPIB for approval of feasibility studies.
• Facilitating sponsors of hydel projects for getting approvals from Design NTDC, System Protection, Telecommunication, and GM (GSC). To arrange meeting with different departments of NTDC for resolution of development issues like interconnection arrangement, Single Line Diagram, Technical data of equipment’s.
During this training period i learn a lot this is a combine cycle power plant so firstly i trace the system. than under stand the (lube oil system/ fuel system/ low temperature or high temperature (LT,HT) system) of WARTSILA 18V46 DIESEL ENGINE. Understanding the STEAM TURBINE OPERATION AND LUBE OIL SYSTEM OF STG. understand the working of RO-PALNT. understand the working of BOILERS. Also participate in engine maintenance.
Internee at Atlas power 225MW combine cycle power plant
Internee at Mangla Dam 1000MW hydel power project