خلاصہ

Highly motivated Reliability & Maintenance Engineer with 7+ years of experience in optimizing electrical systems and ensuring peak performance. Proven ability to develop preventive maintenance plans, troubleshoot equipment failures, and implement root cause analysis to minimize downtime and maximize asset life. Skilled in project management, data-driven decision making, and ensuring regulatory compliance. Eager to contribute expertise to a company focused on continuous improvement and operational excellence.






پراجیکٹس

One month certification in industrial electrical power systems from Descon

تجربہ

کمپنی کا لوگو
Assistant Manager Electrical
Libermann International
اکتوبر ۲۰۱۹ - موجودہ | Sialkot, Pakistan

·         Led the development and implementation of preventive maintenance schedules for electrical systems in new buildings (Building Block-3, Building Block-2 Extension, P11 Unit), promoting long-term equipment reliability and minimizing potential downtime.
·         Oversaw the maintenance of critical electrical equipment (switchgear, panels, transformers, generators, Elevators) to identify and address potential issues proactively, ensuring optimal performance and extending asset lifespan.
·         Supervised a team of technicians in troubleshooting and resolving electrical problems, contributing to the smooth operation and Managed departmental resources for efficient maintenance execution, including spare parts inventory management and vendor coordination.
·         Performed site supervision, ensuring adherence to safety regulations (HSE) during electrical installations and maintenance activities.
·         Utilized data-driven approaches, like daily task reports, to monitor maintenance activities and identify areas for improvement.
Additional Responsibilities:
·      Performed site supervision, ensuring adherence to safety regulations (HSE) during electrical installations and maintenance activities.
·      Managed Electrical/Electronics & Mechanical departments, preparing preventive maintenance schedules and daily activity reports to management.
·      Designed, installed, tested, commissioned, and troubleshooted Low Voltage (LV) distribution systems, including Main Distribution Boards (MDBs), Low Voltage (LV) switchgear (PFI Panels), Motor Control Centers (MCC Panels), Star-Delta starters, Variable Frequency Drives (VFDs), and other associated equipment.
·      Dealt with contractors (fabricators, plumbers, masons) during project execution, preparing new project drawings, layouts, Single Line Diagrams (SLDs), Layouts of Equipment and Machines (LOMs), Bills of Materials (BOMs), Bills of Quantities (BOQs), and price negotiations with vendors.
·      Implemented Lock-out/Tag-out (LOTO) systems during commissioning activities to ensure personnel safety.
·       Managed and supervised the Gent Honeywell Fire Alarm System and fire hydrant system maintenance.




کمپنی کا لوگو
Proposal & Estimation engineer
Green T&D
ستمبر ۲۰۱۸ - اکتوبر ۲۰۱۹ | Lahore, Pakistan

·      Review Contract/ Project specifications, evaluate design and prepare detailed sketches, layout drawings as per IEC and WAPDA Specifications.
·      Preparing of Single lines, Schematic diagram of MV & LV products including 11kV,415V LV/ MV Switchgear Products (e.g. WAPDA Industrial & Protection panel, and in private Transformer Protection panels Incoming and Outgoing panels ATS/AMF panel, PFI Panels, interlocking schemes, Synchronizing Panels, VFD\'s and Soft starters, RMU\'s (4-way) and Distribution Boards as per client requirements.
·      Having sound knowledge in calculations of industrial, commercial, housing loads and power factor Improvement panel calculations.
·      Team coordination with other departments like marketing & Production as well as within the department to provide assistance in making technical submittal and for development of systematic and adequate design.

Planning and supervising Switchgear Internal & External projects and executing them with innovation Solutions.

کمپنی کا لوگو
QA/QC Engineer
Green T&D
جنوری ۲۰۱۸ - ستمبر ۲۰۱۸ | Lahore, Pakistan

·      Department Representation & Coordination among cross functional departments.
·      In-depth Study of Electrical Design and lead the testing for LV & MV Switchgear as per IEC standards.
·      Ensuring the implementation of Inspection (Stage & Final) of Low Voltage & Medium Voltage Switchgear.
·      Ensuring Documentation including As Built and Test reports to be in-line with ready product.
·      Customer handling / Carrying Client General Visits for factory inspection to elaborate all production flow and Testing procedures.
Company Representative for FAT (Factory Acceptance Test)

کمپنی کا لوگو
Trainee Engineer
Green T&D
جولائی ۲۰۱۷ - دسمبر ۲۰۱۷ | Lahore, Pakistan

Green T&D is one of the leading switch gear industry in Pakistan.

کمپنی کا لوگو
Internee
GEPCO
جون ۲۰۱٦ - جون ۲۰۱۷ | Gujranwala, Pakistan

کمپنی کا لوگو
Internee
GEPCO
جون ۲۰۱۴ - اگست ۲۰۱۴ | Gujranwala, Pakistan

تعلیم

University Of Engineering & Technology, Taxila
سرٹیفیکیشن, Electrical Engineering‎
Electrical Power
مکمل
2015
Punjab college sialkot
انٹرمیڈیٹ / اے لیول, , FSC‎
Pre-Engg
درجہ A+
2011
Govt High School Bogray Tehsil Daska Sialkot
میٹرک / او لیول, , SSC‎
Science
درجہ A+
2009

پیشہ ورانہ مہارتیں

ماہر Conservation Awareness
متوسط Electrical Estimating
ماہر Handling Assignments
متوسط Troubleshooting Skills

زبانیں

متوسط چینی
متوسط پنجابی
ماہر انگریزی
ماہر اردو

آپ کن کمپنیز کی پیروی کر رہے ہیں

Muhammad آپکے جاننے والے

Asad Abbas Malik
MCL Resources Private Limited