Having round about 10 years of experience in different projects. Providing professional skills in adopting construction techniques to make the project easier to construct, more economical and meeting the desire quality specifications.
Working as a Asst. Project Manager with Izhar Construction Pvt Ltd. at a Project of Bulleh Shah Packages at Port Qasim Karachi, following are the jobs responsibilities;
Assisting project team in planning and implementation of works.
Analyzing of data as per requirement.
Conducting weekly meeting with departmental team of project.
Monitoring Project Progress and setting deadlines.
Meeting with client representatives regarding project progress and quality of work.
Finance Controlling.
Working as a Senior QA/QC Engineer with WASO on the payroll of Habib Rafiq Pvt, Ltd. and performing the following duties,
Direct participation with Contractor in making Method Statement of any desire activity.
Assuring at site that the activity must be performed as per approved method statement.
Coordinate with contractor for ongoing civil/structural activities, including Excavation, Back-filling, Compaction, Rebar inspection, Formwork Inspection, Field Density Test, Concrete Pouring, Asphalting, Installation Embedded Plates and Anchor Bolts, etc.
Coordinate with the contractors representative Engineers for inspection and meeting about quality problems including the closure of Non-Compliance Report.
Maintain the Project Documentation.
Working as a QA/QC Engneer with Izhar Construction Pvt Ltd, at a project of Dg Khan Cement Company Hub Balochistan and performing the following responsibilities
Assuring that the work is performed as required by the contract and meets or exceeds the required qualities.
Carrying out inspection and checking for quality related procedures at the site and ensures activity at the site are as per approved method statement and quality inspection plan.
Coordinate with construction crew for ongoing civil/structural activities, including Excavation, Back-filling, Compaction, Rebar inspection, Formwork Inspection, Field Density Test, Concrete Pouring, Asphalting, Installation Embedded Plates and Anchor Bolts, etc.
Coordinate with the clients representative Engineers for inspection and meeting about quality problems including the closure of Non-Compliance
Report.
Maintain the documentation of the Project.
Working as a site engineer with “Falaknaz Builders” at “Falaknaz Presidency” and performing following responsibilities:
Checking plans, drawings and quantities for accuracy of calculation.
Resolving any unexpected technical difficulties and other problems that may arise.
Executing project by monitoring and implementing construction activities.
Coordinate with the contractor in the project implementation for inspection and site related issues
Preparing Bar Bending Schedule of all structural members.
Monitoring the progress of work at site, equipment mobilization, work preparation and execution.
Preparing record drawings, technical reports and daily progress report
Checking Reinforcement, Form-work and Pouring of all structural members as per drawing.
Working as a trainee site engineer on a private construction project at Bahria Town Islamabad, Spring North Phase 7, Plot#92-A and performing following responsibilities:
The study of Due Diligence/Feasibility Report of the Project for understanding Cost/Benefit analysis and for comparison and monitoring progress at various stage of the project.
The study of relevant drawings including Architecture and Structure drawing to ensure that specification and relevant guidelines are meet at the execution stages of the project.
The procurement and negotiation process in purchase/rent of various machinery tolls used in the project.
The documentation process for appointment of sub-contractors at the site for various ongoing assignments.
At Exvacation process of the project I monitored water level, depth level, material stress factors, and compute load and grade requirement to meet design specification as per approved drawings.
Direct and particiapated at various phases of the projects in accordance with the approved drawing and relevant feasibility report.