خلاصہ

Operation,maintenance and commissioning skills

Water treatment plant operations and maintinance

Now i m working on multan coca cola plant as a water treatment operator. In my job i am doing my duty as an operator and also technicians of water treatment. All maintenance and operation of water treatment is my responsibility.Now in this this section i am working on RO plant, ultrafiltration plant , nano filtration plant , softener units and turbines. All of these systems operation and maintenance is my responsibility.

I am doing the maintenance of pumps, valves and all pipe lines work.
All fiters repalcing and all treating units backwashes and rinsings are done by operator.


As a water treatment operator its my responsibility to ensure the water quality as per our company parameters. In this practice i have a lot of sensory trainings. All chemicals are prepared by the operator.

پراجیکٹس

Water Treatment Plant Project 2
Water Treatment Plant Errection And Commissioning

تجربہ

کمپنی کا لوگو
Water treatment plant supervisor
Coca Cola Beverages Pakistan Ltd
جنوری ۲۰۱۳ - موجودہ | Multan, Pakistan

 Project Supervisor Water Treatment Plant(Phase 1) (Multan Green Field)

March-2015 to July-2015

• Loading and OFF-loading, Errection, Installation & Commissioning of water Treatment Plant with Aquamatch turkiye

• Operation, Maintenance, Troubleshooting and managing all parameters of the system
Reverse Osmosis (RO) Plant ( Having capacity of 100 m3/hr )
Ultra Filtration (UF) Plant ( Having capacity of 112 m3/hr )
2nd Ultafiltration plant (Having czpzcity of 40m3/hr)
Nano Filtration (NF) ( Having capacity of 16 m3/hr )
Carbon Filtration (CF) (Having capacity of 113m3/hr)
Softening System ( Having capacity of 50 m3/hr )
 Project supervisor Water Treatment Plant (Pha (Multan Green Field) )

April-2017 to June 2017
• Loading and OFF-loading, Errection, Installation & Commissioning of water Treatment Plant with Aquamatch turkiye

• Operation, Maintenance, Troubleshooting and managing all parameters of the system

Reverse Osmosis (RO) Plant ( Having capacity of 100 m3/hr )
Ultra Filtration (UF) Plant ( Having capacity of 112 m3/hr )
Carbon Filtration (CF) (Having capacity of 113m3/hr)
 Both wter treatment plants have the below systems and as an supervisor i am responsible for operations and maintenance off all systems.
 Turbines
 Pumps
 UF
 RO
 ACF
 NF
 Arsenic Filters
 Softing units
 UV

تعلیم

govt college of technology multan
ڈپلوما, 3 years Diploma in Mechanical technology‎
Aerothermodynamics, Applied Mechanics and Design
مکمل
2011

پیشہ ورانہ مہارتیں

ماہر City and guild certification
ماہر Descon technical training certification

زبانیں

ماہر انگریزی

آپ کن کمپنیز کی پیروی کر رہے ہیں