خلاصہ

Had a good working experience in field of engineering. Ability to do all development tasks, managing & monitoring production tasks & meet the targets as well as problem analysis in detail.

پراجیکٹس

Generator Load Bank 800 kW

تجربہ

کمپنی کا لوگو
Senior Project Manager
Solar SME Inc.
جنوری ۲۰۲۱ - موجودہ | Lahore, Pakistan

Working as Senior Project Manager with an American based Solar company.Experience of Electrical & management.

کمپنی کا لوگو
Electrical Engineer
Power Vision Systems Pvt Ltd
اکتوبر ۲۰۱٦ - دسمبر ۲۰۲۰ | Lahore, Pakistan


Job Description
Projects:

Generator Load Bank (Project Length= 04 Months, Completed in Dec 2018_
Harness Test Bench
Relay Test Rig

Working, Testing & Troubleshooting:

Generator Testing
Engine Testing( Dyno Testing)

KUBOTA Engines Thermocouples Testing & Troubleshooting

ECM Engines wriring & Testing

Documentation & Other Tasks:

To plan and manage all activities of the Generator Assembly Line.
Preparation of Generator check sheets, Equipment check sheets, Daily Torque Wrench check sheets, Safety calendar, Accidents monitoring sheet, SOP of Generator, PAC-V Sheets, PDF Sheets of Generator components, Equipment SOP & their Implementations at Generator Assembly Line.
BOQ's development for different projects .
To monitor preparation of AMF panels as per defined SOPs.
To monitor in process & final inspection of AMF panels.
To monitor coupling of generators & installation of Harnesses & AMF panels.
To monitor & approve Generator Testing done on resistive load.
Implementation and monitoring of calibration.
To check ISO 9001:2008 system implementation & control records.
To prepare all Docs relating to ISO implementation.
Currently working on implementation of HSE (OHSAS 18001:2007 & ISO 14001:2015) in company.
Monitoring and enhancing the product Quality.
Maintaining Quality and System Record.
Preparing Inspection plan.
Preparation of Activity Plan.
Monitoring of Activity Plan.
Preparation of Process Quality Control Table-1 (PQCT-1).
Preparation of Process Quality Control Table-2 (PQCT-2).
Preparation of Flow Boards According to SOPs. 19) Kaizen Implementation.
Improvement Report of Department.

Kaizen Implementation.
Preparation of Risk Assessment of Department(Electrical & Machine Shop).
Preparation of Associate Skill Competence Chart
Preparation of Machine Shop documents i.e Manufacturing SOP of fuel tank & Engine Canopy, Equipment Check sheets, Safety monitoring sheets etc.
All tasks related to development of Generator Assy Line.

تعلیم

University of Lahore
بیچلرز, بیچلرز ان سائنس, BS in Electrical Engineering‎
Electrical Engineering
2018

پیشہ ورانہ مہارتیں

ابتدائی Automation Languages Command
ماہر Bill of Quantity(BOQ)
متوسط Electrical Repairing Skills
متوسط Generator Assembly & AMF Panels
ماہر Material Creation
ابتدائی MATLAB Command
ماہر RESTful APIs
متوسط Technological Skills
ابتدائی رسم الآلات

زبانیں

ماہر انگریزی