I am a Civil Engineer having more than 8 years of experience and a proven track record in Water Sector. I have worked for different large scale Public Health & Water Resources Projects including Water Treatment, Water Supply Networks, Sewerage Systems, Storm Water Drainage Systems and Dams & Barrages.
Saaf Paani Project for District Khanewal & Layyah
• Prepare the Design Criteria for Water Filtration & Water Supply System
• Perform the Water Quality Data Analysis
• Perform the Population and Water Demand Analysis
• Water treatment type selection (MMF, UF, RO)
• Perform the Analysis & Design of Distribution system in WaterGEMS
• Prepare the Design of Stand Alone Treatment & Dispersion Systems
• Prepare the design of Tube Wells
• Prepare the design of the pumping machinery
• Prepare the design of the Storage Tanks
• Design of the appurtenances(Air release valves, Sluice valves & Non-Return valves) in the Transmission line
• Prepare the Design Report
• Prepare the Drawings
Master Planning of Sahiwal, Sargodha & DG Khan City
Master Planning for Water Supply System & Storm water Drainage System
• Collect the existing water supply network data and generating the drawings in GIS & AutoCAD
• Identified the existing deficiencies of the Water Supply System
• Planned the future water supply network by dividing the city into zones
• Perform the Water demand analysis on the basis of future population projection
• Planned the District Management Areas (DMA’s) in zone for better water management and leak detection
• Perform the Hydraulic Analysis and designed the DMA’s in WaterGEMS
• Designed the overhead reservoirs
• Designed the Tubewells for water distribution network
• Prepare the drawings for the project in AutoCAD
• Identified the lowlying/problematic areas of the city
• Prepare the Layout for the Proposed Drainage Zones
• Prepare the layout for the Proposed Drains
• Perform the Calculations for the Intensity Duration Curves (IDF) for 2 Years & 5 Years frequency rains
• Calculate the Time of Concentration
• Calculate for the Peak Run Off
• Perform the Design of Drains
Sewerage System of Zahir Pir Town
• Conduct the reconnaissance survey to collect basic information about the project
• Prepare the layout and possible options for the collection of sewage
• Prepare the Hydraulic Statement for the proposed sewer network
• Perform the Design of pipe class for RCC sewers
• Perform the Design of concrete cradle bedding for sewers below sub soil water level
• Perform the Design of Screening Chamber
• Perform the Design of Wet Well & Dry Well
• Perform the Design of Force Main
• Perform the Design of Pumping Machinery
• Perform the Design of outfall Chamber and Sullage Carrier
Water Supply Line from Kudwala to Banna, Cholistan
• Conduct the reconnaissance survey to collect basic information about the project
• Perform the Analysis of the Force main in WaterGEMS
• Perform the Analysis of Water Hammer Effects
Water Supply Improvement Project in Taif, Saudi Arabia
• Collect & Analyze the Survey data in ArcMAP(GIS) and AutoCad
• Prepare the Water Distribution Schema Layout
• Perform the Water Demand Analysis
• Perform Hydraulic Analysis of existing water supply system using Bentley WaterGEMS
• Execute the Calibration of the Hydraulic Model in WaterGEMS using Site Pressure and Flow data
• Perform the Hydraulic Analysis of the future extension and recommendations for the suitable pipe diameters
• Identified the Bottlenecks and Maximum Head losses in the System
• Propose the Recommendations regarding the improvements of Water Network System
Tarbela 4th Extension Hydropower Project
• Finalize the Penstock appurtenances (Ultrasonic Flow Meter & Pressure Gauges, Air Release Valve, Drain Pipes)
• Participate in Water Hammer Calculation for Penstock
• Prepare the Flow Duration Curve for the current scenario of the dam
• Perform the 3D Modeling of Intake ,Tunnel & Penstock to find Internal Hydraulic Pressure & Head Losses using Gambit & ANSYS 3D Fluent
• Participate in evaluating Physical Model Test Report
• Prepare the Energy grade Line & Hydraulic Grade Line along Tunnel 4 in 1D
• Perform the hydrological studies (Incident Pool Levels , Maximum Probable Flood & Flood Routing for Coffer Dam)
• Prepare the design of Drain for Power House
• Prepare the Bills for Equipment and Material from Abroad
• Perform the Verification of Equipment and Material from Abroad
Shah ALLAH Ditta Water Supply Project
• Perform the Hydraulic Analysis of Water Supply Mains
• Perform the Optimisation of the water pressure and pipe sizes using EPANET
• Prepare the Hydraulic Profile of Water Supply Mains
• Propose the Placement of Air Valves & Washouts
• Prepare the longitudinal profiles
• Prepare the Chamber design for Air Valves & Washouts
• Prepare the design Report
Sindh Cities Improvement Project - SCIP-04
• Prepare the Design of main lines for Water Supply in Sukkur
• Perform the Hydraulic modelling of Water Supply System
• Participate in the Master Planning of Waste Water for Sukkur
• Develope the drawings for Master Planning of Sukkur and Waste Water Stabilisation Ponds
• Prepare the Drawings for Water Supply & Waste Water stabilisation Ponds
• Participate in the preparation of Engineer’s Estimate
• Participate in developing Tender documents
Guddu Barrage Rehabilitation Project
• Perform the Design of Wetting Channel
• Perform the Design and Stability Analysis of Embankments for revised flow
• Perform Back Water Calculations
• Prepare the Design & Perform the Stability Analysis of Coffer Dam
Rehabilitation & Upgrading of Balloki Barrage and Canal Head Regulators
• Setting out, leveling and surveying the site
• Checking plans, drawings and quantities for accuracy of calculations
• Ensuring that all materials used and work performed are as per specifications
• Overseeing the selection and requisition of materials and plant
• Managing, monitoring and interpreting the contract design documents supplied by the client
• Liaising with consultants, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project
• Liaising with clients and their representatives
• Day-to-day management of the site, including supervising and monitoring the site labour force and the work of subcontractors
• Planning the work and efficiently organising the plant and site facilities in order to meet agreed deadlines
• Overseeing quality control and health and safety matters on site
Construction of Lackson Tobacco Company Warehouse
• Prepare the Project Plan and Schedule in Primavera & in MS Project
• Prepare the Bills (IPC & Sub-Contractor Bills)
• Perform the Calculation for Material Reconciliation
• Prepare the Bar bending Schedule
• Prepare the Submittals (Shop Drawings, Daily Progress Report etc.)