خلاصہ

i have worked at 132Kv GSS Tank,PESCO for two Months and one month at Chashma hydel power station, WAPDA for One month.I had worked at turnotech as a BSS Engineer for 8 months.

پراجیکٹس

Warid_Mobilink Merger and Bahria Town Karachi

تجربہ

کمپنی کا لوگو
BSS Engineer
TurnoTech (Pvt.) Ltd.
ستمبر ۲۰۱٦ - مئی ۲۰۱۷ | Lahore, Pakistan

 Huawei BSS Equipment Installation of Icc500, Icc330, TP48, ECC500 Cabinets.
 Installation of BBU3900.
 Trouble shooting.
 Expansion and installation of 2G and 3G.
 Installation of GSM,DCS,U900,3G and 4G RRU installation,3936,3959 etc.
 Complete site Survey of Mobilink and Warid in MERGER Project. Power and 3G,4G Survey of CMPAK.
 Moran activity, Cutover.
 Pre-ATP, ATP.
 Deal Customer.
 Audit, HBA.
 Zong 3G, 4G installation.
 Installed rollout site.
 Installed Mini site.

تعلیم

University Of Engineering & Technology, Taxila
بیچلرز, بیچلرز ان سائنس, BSc Electrical Engineering‎
Electric Power and Control System, Electrical Power
CGPA 3.0/4
2016

پیشہ ورانہ مہارتیں

ابتدائی MATLAB Command
ابتدائی رسم الآلات

زبانیں

ماہر پشتو
ماہر اردو
متوسط انگریزی

آپ کن کمپنیز کی پیروی کر رہے ہیں