خلاصہ

I am working of Head Office Project Management Unit Dep, Contract & Tender Dep, in Company, Saudi Arabia experience for 6 years, 1 year experience in Qatar & 9 Years in Pakistani Construction Companies

تجربہ

کمپنی کا لوگو
Senior Quantity Surveyor
Design & Engineering System Lahore
جون ۲۰۱۸ - موجودہ | Lahore, Pakistan

Preparing Monthly Works Progress Invoice (IPC) along with Backup calculation data
Sheet, approved drawings & RFI’s Prepare revises Quantities for Revises Budge
• Preparing Running Bills for Sub Contractor
• Preparing Monthly Material Reconciliation for Site
• Prepare the Bar banding Schedule.
• Preparing the Variances Quantity on the all Substation & Power Plants
• Preparing Issue for Construction Drawings Quantities of Substation & Power Plants
• Prepare variation orders and change order consequent to design changes and preparing
Claims, variation orders along with substantial required documents needed for approval.
• Monitoring required getting and quantities measurements checked in all items of works
• Executed in different stages for Calculations required for payment purposes.

کمپنی کا لوگو
Senior Quantity Surveyor
AL FANAR COMPANY RIYADH KSA
اپریل ۲۰۱۲ - مئی ۲۰۱۸ | Riyadh, Saudi Arabia

Prepare revises Quantities for Revises Budge
Prepare of Running Bills for Sub Contractor
Prepare of Monthly Material Reconciliation for Site
Prepare the Bar banding Schedule
Preparation of Monthly Works Progress Invoice (IPC)
Preparation the Variances Quantity on the all Substation & Power Plants
Preparation of Issue for Construction Drawings Quantities of Substation & Power Plants
Prepare variation orders and change order consequent to design changes and preparing the Claims, variation orders.
Monitoring required getting and quantities measurements checked in all items of works executed in different stages for Calculations required for payment purposes

کمپنی کا لوگو
Quantity Surveyor
AL GHURAIR GIGA PAKISTAN (PRIVATE) LIMITED ISLAMABAD
جولائی ۲۰۱۰ - مارچ ۲۰۱۲ | Islamabad, Pakistan

Check new item for B.O.Q Rate Analysis Check of Running Bills for Sub Contractor & Consultant Check of Monthly Material Reconciliation for Site Check the quality of Material at Site Check the Bar banding Schedule Check & Control the Quality of Construction. Check the Daily Progress Report. Check of Monthly Works Progress Invoice (IPC) Check of AFC (Approved for Construction) Quantities of World Trade Center & Goldcrest

کمپنی کا لوگو
Quantity Surveyor
REDCO INTERNATIONAL WLL DOHA QATAR
جولائی ۲۰۰۹ - جون ۲۰۱۰ | Doha, Qatar

Prepare new item for B.O.Q Rate Analysis Prepare of Running Bills for Sub Contractor & Clint Prepare of Monthly Material Reconciliation for Site Check the quality of Material at Site Prepare the Bar banding Schedule Supervised & Control the Quality of Construction. Prepare the Daily Progress Report. Preparation of Monthly Works Progress Invoice (IPC) Preparation the Variation on the Site Preparation of AFC (Approved for Construction) Quantities of Sewerage Treatment Plant

کمپنی کا لوگو
Quantity Surveyor
Descon Engineer Limited
اگست ۲۰۰۸ - جون ۲۰۰۹ | Attock, Pakistan

Prepare Escalation for Steel & Cement
Prepare new item for B.O.Q Rate Analysis
Prepare of Running Bills for Sub Contractor & Clint
Prepare of Monthly Material Reconciliation for Site
Check the quality of Material at Site
Prepare the Bar banding Schedule
Supervised & Control the Quality of Construction.
Prepare the Daily Progress Report.
Preparation of Monthly Works Progress Invoice (IPC).
Analyzing of Embedded Parts like (Anchor Bolts Steel Template, Channel, I-Section iii& Flanges)
Preparation of AFC (Approved for Construction) Quantities of Cement Plant
b) Sub Contracts
Preparation of subcontract agreements.
Incorporating appropriate terms and conditions to suit with particular requirements.
Evaluation and Certification of Subcontractor’s monthly valuations and final settlements etc

کمپنی کا لوگو
Quantity Surveyor
GUARANTEE ENGINEERS PVT. LIMITED LAHORE
اگست ۲۰۰۴ - جولائی ۲۰۰۸ | Lahore, Pakistan

Prepare Escalation for Steel & Cement
Prepare new item for B.O.Q Rate Analysis
Prepare of Running Bills for Sub Contractor & Clint
Prepare of Monthly Reconciliation for Site
Layout of Building Structures.
Supervised Finishing Works like painting work, plastering work, tiling work etc.
Supervised & checked the form work & Re-bar according to drawing.
Check the quality of concrete
Prepare the Bar banding Schedule and other responsibilities related to Q.S
Supervised & Control the Quality of Construction.
Check the Sanitary & Water Supply by applying test.
Prepare the Daily Progress Report.
Use of Survey instruments like Level, Theodolite

کمپنی کا لوگو
Associate Site Engineer
DONG FANG ELECTRIC CONSTRUCTION, DEC
ستمبر ۲۰۰۲ - جولائی ۲۰۰۴ | Attock, Pakistan

Layout of Building Structures. Supervised Finishing Works like painting work, plastering work, tiling work etc. Supervised & checked the form work & Re-bar according to drawing. Check the quality of concrete Prepare the Bar banding Schedule and other responsibilities related to Q.S. Supervised & Control the Quality of Construction. Check the Sanitary & Water Supply by applying test. Prepare the Daily Progress Report Use of Survey instruments like Level, Theodolite

تعلیم

Global Institute, Lahore
بیچلرز, بیچلرز ان ٹیکنالوجی, B-Tech‎
Civil
CGPA 3.3/4
2015
Punjab Board of Technical Education Lahore
ڈپلوما, Diploma of Associte Engineer (Civil)‎
مکمل
2002

پیشہ ورانہ مہارتیں

ماہر preparation of BOQs
ابتدائی 2D Drawaing
ماہر Accounts Administration
ابتدائی Handling Assignments
ماہر Market Know how
ماہر Quantity Surveying
ماہر surveying/estimation
ماہر رسم الآلات

زبانیں

ماہر اردو
ابتدائی عربی
متوسط انگریزی