I have 3 years of Experience as a Chemical Engineer.I believe that I am adaptive and versatile team player and Team Leader.Equipped with a clear sense of direction and passion of hard work. My philosophy in life focuses on accomplishments through diligence, hard work and relentless strive for excellence in everything.
I am working as a Process Engineer R&D.
- Prepared PDR ,Use Cases ,Presentation for Client.
- Design liquid cooling system for Client.
- Testing and Verification of Liquid Cooling Component.
- Done DFX & FMECA for Design Products.
- Solid Works Modeling and Routing of Cooling System.
- Coordination with control team.
- Prepared BOM ,Manage Procrement of goods and Shipments.
NISHAT CHUNIAN ELECTRIC COMPANY LTD May.2018- Dec.2018
NCECL is Coal fired power plant which includes Siemens SST-400 Steam Turbine and two CFB boilers with 110 tons/hr. capacity each, Coal & Ash Handling System & RO plant with 480 m3/day capacity.
I am working as a Shift Engineer at NCECL. Responsibilities
– Shift plan handling and managing Manpower.
– Plant operations Startup Shutdown activities and trouble shootings.
– DCS/PLC monitoring and controlling parameters.
– Create Job packages for annual shut down.
– Keep record of Startup, Shut down and down time, incident reports.
– Keep close communication with consumer for the power load adjustment.
– Implementation and Issuance of work permits and coordination with maintenance staff.
I have 14 months of experience of Process operations at FFBL Karachi as a Operation Engineer. I have depth knowledge of
I am worked at Urea Plant Operations department as a Management Associate (Operation Engineer).
Responsibilities
To assist shift in charge in routine activities which included:
– Daily production report, overall plant status report, Shift report and audit report on SAP.
– Safe execution of routine maintenance activities.
– Conducting safety talks and safety training of operators in shift.
– Shift plan handling and managing Manpower.
– Plant operations Startup Shutdown activities and trouble shootings.
– DCS/PLC monitoring and controlling parameters.
– Analysis of lab results of product, effluents, emissions and other important process parameters.
– Read and analyze charts, work orders, production schedules, and other records and reports to determine
production requirements and to evaluate current production estimates and outputs.
Project
– Urea Granulation unit to improve operational reliability with reduce granulator washing frequency.
– Resolved Urea Carry over problem in Rectifying Column
– Chemical cleaning of Recirculation heater
– Prepared Ammonia tie in plan for new ammonia storage tank
– Improve SOP for Delta P measuring of ferrules
– Increased RPM of Service Air Blower for H2 Convertor
– Complete all Turn around assignments
As internee thoroughly understand operation and production process of vegetable Ghee and oil, Water Treatment Process , Production of Hydrogen and draw process flow diagram, made reports.
As internee internship based upon rotation through different units as one week for each, did field visits, prepared assignment, draw process flow diagram, reports, and gave viva and interview of final report.
Thoroughly understand operation and production process of RO plant ,Caustic soda, Hydrochloric acid and Liquefaction of Chlorine.