خلاصہ

I have diverse experience in K-Electric from 11KV to 420/220V operations to quality inspection and monitoring departments currently


working in OCR (Operation Control Room) department at K-Electric, working on switching of 11KV network, before this I worked in


PMO (Project Management Office) department looking after planning and execution of Projects with fulfilling their Quality standard


and Post Governance after execution of schemes as loss and theft can be control along with material budgeting. Along with this equipped


with one year of versatile & diversified work experience in Trainee Engineer program at K-Electric.


I also did internship from Lucky Cement Limited, Al-Abbas Sugar Mill and 132KV Grid station Mirpurkhas in a consistent


manner, knowing the working principles and managing client relationships

پراجیکٹس

LT ABC Planning, Execution And Post Governance

تجربہ

کمپنی کا لوگو
Deputy Manager
K-Electric
جنوری ۲۰۲۰ - موجودہ | Karachi, Pakistan

11KV Operations
- Switching of feeders
- Maintenance of 11KV feeders
- Reducing SAIFI and SAIDI
- Back feeding of feeders in case of EHT interruption
- Load maintenance and balancing at grid transformers and distribution transformers
- Identification and maintenance of sick feeders having high noise area
- Tracing of 11KV underground cable faults
- 11KV Network updating and route of underground cable on GIS
- Arrangement and normalization of Planned/Forced Shutdowns

کمپنی کا لوگو
Assistant Manager
K-Electric
جولائی ۲۰۱٦ - دسمبر ۲۰۱۹ | Karachi, Pakistan

- Planning HT/LT shutdown
- Installations of LT ABC (Aerial Bundled Cable) for reduction of Losses and Complaints
- Smooth coordination between execution and procurement department
- Replacement of Analog energy meters with Static energy meters under FMR/OMR project
- System Improvement Program (SIP) for Improvement of revenue and reduction of Faults.
- Preventive Maintenance of PMTs/Substations
- Managing additional assignments of distribution network faults and loss rectification.
- Quality Assurance for withstand projects on Company predefined standards.
- Prepare and Priorities work to achieve maximum output from teams.
- Safety: Tool box talk, PPE and SPE checking and arranging for teams.
Achievement
- Recovered 28Millions by Installing LT ABC in highly noise area along with reduction of technical complaints
- Recovered 13Millions through MNCV (Mobile new Connection van) Projects
- No fatality or incident in throughout carrie

کمپنی کا لوگو
Trainee Engineer - Distribution
K-Electric
جون ۲۰۱۵ - جون ۲۰۱٦ | Karachi, Pakistan

Learning the principles of 11KV and 420/220V departments, some highlighted points are as below
- 11 KV Operations
- HT SIPs (System improvement schemes)
- Shifting of underground cables
- Planning and Execution of system Improvement Projects (SIP)
- Segregation of High loss and Low Loss feeders for reduction in losses.
- Managing Corrective Maintenance department
- Timely fault resolution for securing SAIFI and SAIDI
- Managing NMS teams and their work responsibilities
- Testing and load balancing of Transformers
- Safety: Tool box talk, PPE and SPE

کمپنی کا لوگو
Internee
Lucky Cement Limited
جون ۲۰۱۴ - جولائی ۲۰۱۴ | Karachi, Pakistan

appointed as an internee
seek information about production of electricity and recycle of waste in making electricity and gain info about motors and motor winding

کمپنی کا لوگو
Internee
Al-Abbas sugar mill
جولائی ۲۰۱۳ - اگست ۲۰۱۳ | Mirpur Khas, Pakistan

کمپنی کا لوگو
Internee
132kv Grid station Mirpurkhas
جون ۲۰۱۲ - جولائی ۲۰۱۲ | Mirpur Khas, Pakistan

gaining information about switch yard, relays, breakers, capacitor bank, up down of voltages and power, transmission and power management

تعلیم

NED University of Engineering & Technology
ماسٹرز, ماسٹرز ان سائنس, Energy Management‎
Project Management Framework And Tools, Total Quality Management, Strategic Planning And Decision Making
CGPA 2.9/4
2018
Quaid-e-Awam University of Engineering, Science & Technology
بیچلرز, , B.E Electrical Engineering‎
Electrical
فی صد 70%
2014
Govt: degree collage mithi
انٹرمیڈیٹ / اے لیول, , Intermediate in Pre Engineering‎
Pre-Engineering
فی صد 81%
2010
Govt: High school Mithi
میٹرک / او لیول, , Matriculation in Science‎
Science
فی صد 75%
2008

پیشہ ورانہ مہارتیں

متوسط Ability To Operate MS Project
ماہر Accounts Administration
ماہر Achieve Deadlines
متوسط Compliance
متوسط Cooordination Skills
ماہر Electric Power Management
متوسط Electrical Controls
متوسط Electrical Designs
ماہر Electrical Layouts
ماہر Front Office Support
ماہر Handling Assignments
متوسط Handling Plasma Screens
ماہر Import Operations Handling
متوسط Individuals / Consumers
متوسط Instruments Drawing
ماہر Internet Services
ماہر Microsoft Outlook
متوسط Negotiation Skills
متوسط People Management Skills
متوسط Power Electronics Designing
ماہر Prioritization
ماہر Project Administration
ماہر Project Management Methodologies
متوسط Public Dealing
ماہر Quality Improvement Processes
ماہر Record Keeping
متوسط Rural Markets Knowledge
متوسط Talent Acquisiition
متوسط Team Building
ماہر Team Leadership
متوسط TECEPYION=
متوسط Technical Sales Consultancy
ابتدائی Tools Command

زبانیں

ماہر انگریزی
ماہر اردو
متوسط ہندی
ماہر سندھی