I have diverse experience in K-Electric from 11KV to 420/220V operations to quality inspection and monitoring departments currently
working in OCR (Operation Control Room) department at K-Electric, working on switching of 11KV network, before this I worked in
PMO (Project Management Office) department looking after planning and execution of Projects with fulfilling their Quality standard
and Post Governance after execution of schemes as loss and theft can be control along with material budgeting. Along with this equipped
with one year of versatile & diversified work experience in Trainee Engineer program at K-Electric.
I also did internship from Lucky Cement Limited, Al-Abbas Sugar Mill and 132KV Grid station Mirpurkhas in a consistent
manner, knowing the working principles and managing client relationships
11KV Operations
- Switching of feeders
- Maintenance of 11KV feeders
- Reducing SAIFI and SAIDI
- Back feeding of feeders in case of EHT interruption
- Load maintenance and balancing at grid transformers and distribution transformers
- Identification and maintenance of sick feeders having high noise area
- Tracing of 11KV underground cable faults
- 11KV Network updating and route of underground cable on GIS
- Arrangement and normalization of Planned/Forced Shutdowns
- Planning HT/LT shutdown
- Installations of LT ABC (Aerial Bundled Cable) for reduction of Losses and Complaints
- Smooth coordination between execution and procurement department
- Replacement of Analog energy meters with Static energy meters under FMR/OMR project
- System Improvement Program (SIP) for Improvement of revenue and reduction of Faults.
- Preventive Maintenance of PMTs/Substations
- Managing additional assignments of distribution network faults and loss rectification.
- Quality Assurance for withstand projects on Company predefined standards.
- Prepare and Priorities work to achieve maximum output from teams.
- Safety: Tool box talk, PPE and SPE checking and arranging for teams.
Achievement
- Recovered 28Millions by Installing LT ABC in highly noise area along with reduction of technical complaints
- Recovered 13Millions through MNCV (Mobile new Connection van) Projects
- No fatality or incident in throughout carrie
Learning the principles of 11KV and 420/220V departments, some highlighted points are as below
- 11 KV Operations
- HT SIPs (System improvement schemes)
- Shifting of underground cables
- Planning and Execution of system Improvement Projects (SIP)
- Segregation of High loss and Low Loss feeders for reduction in losses.
- Managing Corrective Maintenance department
- Timely fault resolution for securing SAIFI and SAIDI
- Managing NMS teams and their work responsibilities
- Testing and load balancing of Transformers
- Safety: Tool box talk, PPE and SPE
appointed as an internee
seek information about production of electricity and recycle of waste in making electricity and gain info about motors and motor winding
gaining information about switch yard, relays, breakers, capacitor bank, up down of voltages and power, transmission and power management