-2.5 years of experience as Assistant Manager Operations in Nishat Chunian 46 MW Coal fired Power Plant
-2 years of Experience as Shift Engineer Production in Ittehad Chemicals Pvt. Ltd ( CHLOR-ALKALI PLANT)
-Certification in NEBOSH IGC in occupational health and safety
-Currently working as Assistant Manager Operations at 46MW coal fired power plant
-Responsible for monitoring the operations of
-2x110 ton/hr. capacity CFBC Boilers
-46 MW Capacity Siemens Steam Turbine SST-400
-140 ton/ hr. coal conveying system
-2X Electrostatic Precipitator with 4 transformers each
-20 m3/hr. Water treatment plant,
-3 X Air compressors & 3 X Dryers,
-HVAC and cooling tower system
Worked as Assistant Shift Engineer Production
-Monitoring and control of Brine Purification Plant, Ion Exchange Membranes Cell Rooms, Chlorine Compressor Unit, HCL furnaces, Caustic Evaporation Plant and Caustic Solidification Plant