Dear Hiring Manager,
Enclosed please find my resume for your review. I am applying for the post of Electrical Engineer. I have extensive 1.5 years of working experience in Power and Renewable projects planning and management which is very relevant to this position and will allow me to start successfully with a little training.
I hold B.Sc. Electrical (Power) Engineering from Lahore Leads University, Lahore. My solid academic background, along with passion for engineering enables me to contribute a great deal with your esteemed organization.
I look forward to meeting with you for an interview. Thank you for your time and consideration.
inspection of Grid Tie with backup solr system for KPUP Projects
Fire Alarm system
Fire Hydrant
Fire sprinklers system
Solar Pumping Projects ( Agriculture Dept. OFWM) To Prepare proposal,design and control documents of the project. Record Management of all projects of solar pumps. Designing,supply and installation of the solar Pumps Commissioning of the solar Pumping Projects To check the electrical parameters of solar equipment To check the quality and standard of material Design and draw the Single Line Diagram of Project Follow up with relevant department
Engineering Field work:
Worked on Solar on grid Solar off grid and Hybrid system:
To estimate the quantity and cost of materials utilized in projects.
To check the quality and delivery of materials on time.
To work on different tenders related to solar projects.
Design, supply, Installation and Commissioning of Projects.
Design, supply installation and Commissioning Solar Pumps.
Design and draw the Single Line Diagram of Project
Solar ON/OFF and Hybrid Grid Projects.
Management and Maintenance of Project.
Preparation of Proposals of relevant projects
Management work:
Follow-up with the relevant department.
Record Management of all projects of solar pumps
Preparation proposal,design and control documents of the project
Preparation of different technical documents ,Reports ,BOQ,PO's,Project Plan
HFO Power Plant
Control , operation and maintenance work
The Installation of Power Factor Controller.
The Installation of HT and LT and CT’s & PT’s Panels.
NGR (Neutral ground Resistance) Electrification.
Connections of Bus bars and Transformer.
The Installation of Control and Excitation Panel units
Worked on HFO(wartsila 6.9MW and MAN 4.2MW)
Worked on Jenbacher's (2000kw),Allied CAT Diesel Engines(500kw)
Worked on Turbomach Gas Turbine of 4.6MW(2)
Worked on Electrification and Cable tagging ,laying and terminating.
Trainee engineer at Sarena power house site on the installation of new turbine(under dongfeng)
• To understand and perform practically
• The installation of Electrical Panels equipments (CT’s & PT’s)
• Installation of Protection Devices such as Breakers (ACB, VCB), Relays, Fuses, &Isolators.
• The Installation of HT and LT Panels.
• The Installation of Control and Excitation Panel units.
• The Installation of Power Factor Controller.
• NGR (Neutral ground Resistance) Electrification.
• Connections of Bus bars and Transformer.