Complete Erection of 120 TPH Feeds Plant with multinational MUYANG Group.
Designing of system like control panels, switchgear single lines diagrams of system and follow them for installation, commissioning and testing.
Designing of LV,JB,& DB panels,installation ,& termination work, interconnection with control panels.
Electrical Industrial Engineering covering Generators, Transformers, Switch gears, Relays & Protections,
PLC, HMI, SCADA, RTU, Drives, Competency of HT/LT Electrification designs & HVAC system. Earthen system, Lighting loads with GFCI & Earth leakage protection.
Hand on experience of designing, installation, commissioning, testing, troubleshooting and fixing the LV/ELV/HV Electrical power system.
Designing and implementing of motor control, AVRs, VFDs and alternators. Calculate Load Schedule for DB, SMDB, and MDB & LVP.
Completely understand the characteristics of electrical Power/loads i.e. KW, KVA and KVAR calculations. Construction activities Installation and Testing such as Cabling, Panel wiring, Cable Installation and Fire alarm system.
Industrial HT/LT Electrification designing, earth work and Air Conditioning executions learning’s. Prepare & evaluate the material submitting for Electrical, Mechanical and Plumbing material.
Floating enquiries to supplier /Manufacturers and prepare comparison sheets. Negotiate with suppliers on technical and commercial aspects of products.
Site Supervision, handling cabling workout, and test the system according to drawings. Be insure of the safety at work.
Meetings and Assigning of work to sub-contractors. Checking and approving submittals by sub-contractors.
Assuring quality work done according to plan and co
Make sure that all Method Statements & Risk Assessments are in line with company HSE procedures and suit the relevant Consultants requirements and recorded on a usable platform - issue to the relevant Supervisors/QA/QC & Engineers Foreman.
Doing Inspection ensured testing and Documentation of the following activities such as Cabling, Panel wiring, Cable Installation, Earthen system and Fire alarm system, construction work and testing.
Report writing ability.
Make sure that all Method Statements & Risk Assessments are in line with company HSE procedures and suit the relevant Consultants requirements and recorded on a usable platform - issue to the relevant Supervisors/QA/QC & Engineers Foreman.
To follow up shop drawings for electrical / MEPS services. Upgrade the installed Power Factor Improvement Plant. Planning, monitoring & executing the electrical works at site.
Electrical Industrial Engineering covering Generators, Transformers, Switch gears, Relays & Protections,
PLC, HMI, SCADA, RTU, Drives, Competency of HT/LT Electrification designs & HVAC system. Earthen system, Lighting loads with GFCI & Earth leakage protection.
To accomplish the assigned work within the schedule.
To discuss the site-related problems with the top-management.
Writing daily workout report of site, submit to Manager and discuss on future plans.
Upgrade the installed Power Factor Improvement Plant.
Planning, monitoring & executing the electrical works at site.
Managing the man-power at site against various electrical activities.