خلاصہ


To acquire a position in a healthy working environment of a prestigious organization to spruce my present knowledge & skills and to bring out the best of myself to deliver results and add value to the business


پراجیکٹس

Petro Rabic

تجربہ

کمپنی کا لوگو
BMS & PMS OPERATOR
SRACO - Saeed R. Al-Zahrani Corp.
ستمبر ۲۰۱۷ - موجودہ | Bisha, Saudi Arabia


PEL was established in 1956 with the technical collaboration of M/S AEG Germany and is the oldest composite electrical equipment manufacturing unit in Pakistan. The products manufactured. By PEL have always been of a high standard the name PEL is synonymous with quality all over the Pakistan...PEL, since its inception, has been acting as an institution working for the advancement and development of engineering and technology in Pakistan. The company comprises of two divisions: Appliances Division and Power Division. Appliances Division manufactures Air Conditioners, Refrigerators and Deep Freezers Power Division manufactures Energy meters, Distribution transformers, pole mounted 11 kV pad mounted transformers switchgears, kiosks compact stations, shunt capacitor banks etc. All these electrical goods are assembled under strict quality control in according with (IEC).
Present position                                                                      
·         I am working as a Sub Engineer Quality Control Transformer (I & QC) Power Division Department in Pak Elektron Limited (PEL) Lahore Pakistan. From Feb. 2007 to Feb.2014
·         I am working as a Electrical Technician Alfanar Operation & Maintenance Department in Saudi arabia From  Feb . 2015 to  March 2017
 
·         I am working as a King Abdullah Hospital ,Bisha ,Saudi Arabia , Ministry of Health in Electrical Department as a BMS & PMS OPERATORS , From Sep .2017 to till date
·         Also having 1 year  experiences as a Building Electricians Supervisor with a Contractor of Building construction in Lahore
·         Also having experiences in department of Transformer Testing Section of PEL as an Inspector……
·         Also having experiences in department of Electrical maintenance Section of PEL as
·         an  ( A / Supervisor )
·         I am working as a Service Engineer Department in (Inter Link Engineer Automation) Lahore Pakistan.
·         Also having 3year experiences as a (Philip Morris International (PMI) Company.
·         I am working as a DSNG OPERTOR Channel (Din News ) working experiences 2 year in System Technical Operator
 Experience                                                                                   
·         One year experience AT ACERS CONEX CONSTRUCTION (PVT) LTD AS A
(ASSISTANT STORE KEEPER) AT (DHA PHASE – VIII
 COMMERCILAL BROAD WAY PROJECT).                                                   
 
Experience  In Detail                                                                              
Here I make daily diesel oil statement that how much diesel is issued on various sectors according to their consumption and how much diesel is issued to various sub – contractors and transferring the issuing quantity to their account to their daily rates.
Maintain ledgers of various stocks like ELECTRICAL, PUBLIC HEALTH CIVIL TOOLS AND ASSETS ets.
Making soil report that how much soil have dumped in pervious day in various sectors and record in Microsoft excel file according to their cubic feet and in respect of various suppliers.
Maintain special ledger of CIVIL products like R.C.C. PIPES, BRICKS, BRICKS BALLAST, and SAND RAVI AND CRUSH etc. Give daily material progress report to General Manager Construction and planning Engineer.
Checking bills of various suppliers like soil crush sand etc.
Working Experience    
Organization
Designation
Packages Ltd Lahore Pakistan
INTERNEE
Mannan Shahid Foraging Ltd
        CNC Milling (Operator)
      Fiber Craft Industry
Field Worker
Continental Plastic Industry Pvt.Ld
Injection Mouding M/C With
          CNC Robot (Operator)
 
JOB RESPONSIBILITIES                                                                   
·         I Performed the Electrical Testing as well as physical inspection of Transformers from Initial Stage to Final Stage as per Customer specification and IEC standards.
·         I check the Quality of Incoming Receiving Material According to specified Drawing    (IEC &WAPDA Standard)
PERFORMED TESTS                                                                
·         I performed all type of testing of Transformers according to specifications.(IEC &WAPDA Standard)
·         I performed Complete Routine electrical testing of ITP Transformer (CT PT).
OTHER TESTING                                                                     
·         I performed the Electrical Final Testing of Control Transformer’s according to specifications.
·         I performed all type of oil testing of Transformer.
·         I perform the testing of auxiliary and outdoor Control panel of Power transformer.
·         I perform the wiring of Transformer accessories and its control panel.
·         I Performed the electrical testing of Cupper Strip & Enamels Wire as per requirements
·         I Performed the Bird protection test on cover plates of the distribution transformers.
·         Commissioning testing, servicing and installation of transformers at various sites of Pakistan.
·         I conduced Special test on all Power & distribution transformers.                             Follow up international Electro-technical Commission (I.E.C) standards.
·         Make complete fault analysis report of damaged transformers under warranty from Wapda and private customer end.
·         Monitoring instrumentation control and their calibrations.
·         Prepare the daily and monthly report of transformers and preparation of ISO documents.
·         Coordinates with designer for assembly and manufacturing problems.
·         To conduct the Internal Audit and Implementation the requirements all workshops.
·         Look after all process stages of transformers manufacturing unit. Prepare the daily and monthly report of transformers and preparation of ISO documents.
 
Other Experience                                                                    
·         Also having experiences in department of ITP (CT, PT) Section of PEL as a quality control inspector.
·         To supervisor the WAPDA & private  repair section .And do fault analysis and prepare the report for  manager prod
·         To deal with the private customer about the transformer complaints
·         To prepare the transformer Estimate for manager production
·         To ensure that all production activities in Different sections of Distribution Transformer like are performed as per daily & monthly production plan issued by manager planning  Distribution Transformer .
·         To  coordinate with the Design department , Local procurement department , Material planning department , maintenance department ,& Quality department in order to ensure the smooth  manufacturing activities .
·         To check the process of all sections & try to reduce the process time period.
·         To set the criteria and design the production activities for the control the rework & rejection rate in diff. section of distribution transformer as mentioned already.
·         I Performed the Electrical testing as well as physical inspection of Transformers from initial Stage to Final Stage as per customer specification and IEC standards.
·         I check the Quality of  Incoming Receiving  Material According to specified  Drawing  ( IEC & WAPDA )
·         To prepare all files reacted ISO 9001 (2007), 14001 (2004), 18001 (OHSAS) Occupational Health & Safety & Assessment System (2008).
·         Control the Daily Dispatches of finished goods of Power Products.
Working Experience                                                                                
·         Working Experience in (Pak Electron Limited) PEL. (PD)
·         Job period Feb.2007 to Feb.2014

کمپنی کا لوگو
BMS & PMS OPERATOR
SRACO - Saeed R. Al-Zahrani Corp.
جولائی ۲۰۱۴ - موجودہ | Bisha, Saudi Arabia


PEL was established in 1956 with the technical collaboration of M/S AEG Germany and is the oldest composite electrical equipment manufacturing unit in Pakistan. The products manufactured. By PEL have always been of a high standard the name PEL is synonymous with quality all over the Pakistan...PEL, since its inception, has been acting as an institution working for the advancement and development of engineering and technology in Pakistan. The company comprises of two divisions: Appliances Division and Power Division. Appliances Division manufactures Air Conditioners, Refrigerators and Deep Freezers Power Division manufactures Energy meters, Distribution transformers, pole mounted 11 kV pad mounted transformers switchgears, kiosks compact stations, shunt capacitor banks etc. All these electrical goods are assembled under strict quality control in according with (IEC).
Present position                                                                      
      I am working as a Sub Engineer Quality Control Transformer (I & QC) Power Division Department in Pak Elektron Limited (PEL) Lahore Pakistan. From Feb. 2007 to Feb.2014
      I am working as a Electrical Technician Alfanar Operation & Maintenance Department in Saudi arabia From  Feb . 2015 to  March 2017
         I am working as a King Abdullah Hospital ,Bisha ,Saudi Arabia , Ministry of Health in Electrical Department as a BMS & PMS OPERATORS , From Sep .2017 to till date
        Also having 1 year  experiences as a Building Electricians Supervisor with a Contractor of Building construction in Lahore
        Also having experiences in department of Transformer Testing Section of PEL as an Inspector……
       Also having experiences in department of Electrical maintenance Section of PEL as
     an  ( A / Supervisor )
      I am working as a Service Engineer Department in (Inter Link Engineer Automation) Lahore Pakistan.
         Also having 3year experiences as a (Philip Morris International (PMI) Company
     I am working as a DSNG OPERTOR Channel (Din News ) working experiences 2 year in System Technical Operato Experience                                                                                   
      One year experience AT ACERS CONEX CONSTRUCTION (PVT) LTD AS A
(ASSISTANT STORE KEEPER) AT (DHA PHASE – VIII
 COMMERCILAL BROAD WAY PROJECT)                                                   
 Experience  In Detail                                                                              Here I make daily diesel oil statement that how much diesel is issued on various sectors according to their consumption and how much diesel is issued to various sub – contractors and transferring the issuing quantity to their account to their daily rates.Maintain ledgers of various stocks like ELECTRICAL, PUBLIC HEALTH CIVIL TOOLS AND ASSETS ets.Making soil report that how much soil have dumped in pervious day in various sectors and record in Microsoft excel file according to their cubic feet and in respect of various suppliers.Maintain special ledger of CIVIL products like R.C.C. PIPES, BRICKS, BRICKS BALLAST, and SAND RAVI AND CRUSH etc. Give daily material progress report to General Manager Construction and planning Engineer.Checking bills of various suppliers like soil crush sand etc.

Working Experience    




Organization


Designation




Packages Ltd Lahore Pakistan


INTERNEE




Mannan Shahid Foraging Ltd


        CNC Milling (Operator)




      Fiber Craft Industry


Field Worker




Continental Plastic Industry Pvt.Ld


Injection Mouding M/C With
          CNC Robot (Operator)





 
JOB RESPONSIBILITIES                                                                   
      I Performed the Electrical Testing as well as physical inspection of Transformers from Initial Stage to Final Stage as per Customer specification and IEC standards

       I check the Quality of Incoming Receiving Material According to specified Drawing    (IEC &WAPDA Standard)

PERFORMED TESTS                                                                
      I performed all type of testing of Transformers according to specifications.(IEC &WAPDA Standard)
     I performed Complete Routine electrical testing of ITP Transformer (CT PT).
OTHER TESTING                                                                             I performed the Electrical Final Testing of Control Transformer’s according to specifications
       I performed all type of oil testing of Transformer.        I perform the testing of auxiliary and outdoor Control panel of Power transformer.
     I perform the wiring of Transformer accessories and its control panel       I Performed the electrical testing of Cupper Strip & Enamels Wire as per requirement        I Performed the Bird protection test on cover plates of the distribution transformers        Commissioning testing, servicing and installation of transformers at various sites of Pakistan.        I conduced Special test on all Power & distribution transformers.                             Follow up international Electro-technical Commission (I.E.C) standards.        Make complete fault analysis report of damaged transformers under warranty from Wapda and private customer end.      Monitoring instrumentation control and their calibrations.
      Prepare the daily and monthly report of transformers and preparation of ISO documents.
      Coordinates with designer for assembly and manufacturing problems        To conduct the Internal Audit and Implementation the requirements all workshops.
      Look after all process stages of transformers manufacturing unit. Prepare the daily and monthly report of transformers and preparation of ISO documents.

 
Other Experience                                                                    
         Also having experiences in department of ITP (CT, PT) Section of PEL as a quality control inspector.
         To supervisor the WAPDA & private  repair section .And do fault analysis and prepare the report for  manager prod
       To deal with the private customer about the transformer complaint         To prepare the transformer Estimate for manager production
      To ensure that all production activities in Different sections of Distribution Transformer like are performed as per daily & monthly production plan issued by manager planning  Distribution Transformer .
     To  coordinate with the Design department , Local procurement department , Material planning department , maintenance department ,& Quality department in order to ensure the smooth  manufacturing activities .
      To check the process of all sections & try to reduce the process time period.
         To set the criteria and design the production activities for the control the rework & rejection rate in diff. section of distribution transformer as mentioned already.
         I Performed the Electrical testing as well as physical inspection of Transformers from initial Stage to Final Stage as per customer specification and IEC standards.
         I check the Quality of  Incoming Receiving  Material According to specified  Drawing  ( IEC & WAPDA )
        To prepare all files reacted ISO 9001 (2007), 14001 (2004), 18001 (OHSAS) Occupational Health & Safety & Assessment System (2008) QULTIY       Control the Daily Dispatches of finished goods of Power Products.

Working Experience                                                                                       Working Experience in (Pak Electron Limited) PEL. (PD)         Job period Feb.2007 to Feb.2014

کمپنی کا لوگو
Sub Engineer
Pak Electron Limited ( PEL )
فروری ۲۰۰۷ - جنوری ۲۰۱۴ | Lahore, Pakistan

تعلیم

ppi
ڈپلوما, DAE Electrical‎
Research
مکمل
2009
ppi
ڈپلوما, DAE Electrical‎
E, T 115
مکمل
2009

پیشہ ورانہ مہارتیں

ابتدائی Handling Assignments
ابتدائی Malfunctions Identification

زبانیں

ابتدائی اردو