To utilize my technical knowledge in fulfilling my career and organization objectives as well as to synergize my efforts with the organization's vision and demanding all my skills to contribute for the development of organization with my impressive performance and mission in achieving my goals. Also for maintaining all aspects of the quality management for developing and implementing effective quality control processes and structures in a manufacturing and corporate environment.
Project: C-EIR (DIRBS) - Device Identification Registration and blocking System. (Project of Pakistan Telecommunication Authority, PTA)
• Integration of DIRBS project with Telecom Operators in Pakistan (Jazz, Telenor, Ufone and Zong).
• Execute daily development administration and changes in an end-to-end VMware virtualization tools.
• Installation, Configuration, Up-gradation of PostgreSQL 9.5/10 database.
• Configuration of Master/Slave Replication and Logical Replication for Data Consistency and take Incremental Backup and Restoring as per company Policy.
• Installation and Configuration of Pg_Pool for session pooling and load balancing, Barman to implement disaster recovery solutions.
• Implementation of RLS on tables for specific user management and Privileges on tables and databases as per company Policy.
• Authenticating techniques using SHA-256 and MD5 for password authentication.
• ETL tools used to extract, store and load data of operators into database for analysis of project parameters.
• Use of SQL, No-SQL, RDBMS systems (SQL Server, DB2 etc.) to gather insight of Operators data.
• Generate and analysis of data reports using Business Intelligence (BI) tools Pentaho, Jaspersoft studio and Power BI, Micro strategy etc. for the business development and management review.
• Maintained daily/hourly statistics and monitoring of system with tools Zabbix, Kibana, Elasticsearch, Graylog etc.
• Transition developed by BI systems to operations & support team for Project.
• Core Network designing of DIRBS project ,including juniper SRX 1500 Firewall in HA, juniper SSG320 firewall ,juniper EX 4550 switches in chassis.
• Consultant to Devices registration system (DRS) of Pakistan, portal for device registration in Pakistan
• Terminal/Network Equipment Technical Assessment Engineer for device Import/Use in Pakistan.
• NOC Issuance (Commercial & Personal) upon the technical validation of device with GSMA.
• Made document Technical Standards Regulations for Radio Frequency, Electromagnetic Compatibility, Specific absorption Rate and Terrestrial Devices followed for Type Approval worldwide.
• Special Project: C-EIR (DIRBS) - Device Identification Registration and blocking System.
Centralized EIR (DIRBS): PTA is developing a centralized EIR system (DIRBS). The system will provide MNO’s, Customs, OEMs the ability to check, identify, monitor and discourage the import of devices into the country through grey channel.
- Responsible for the management and integration of the project from administrative perspective.
- Working with different cross-functional teams of Operators, Government Departments and Consultants for Development and integration of Project.
• Designed simulation of Power Conditioning Unit (PCU) and backup plan of satellite under the memorandum of FAST University and SUPARCO.
• Management of Project as team lead and Coordinate with SUPARCO technical focal person for implementation of prototype.
• Worked in Management Information System (MIS) Department (On Cisco Routers and Switches).
• Worked in Services Department (Designing and overseeing the reconfiguration, Maintenance, Automatic Transfer control, Management in Power Generation and Distribution System).