A Good knowledge of Read and understand Electrical Power & Control SLD diagram Such as 220KV 132Kv 11Kv and 0.4Kv.
Hand on experiance in maintenance and troubleshootig of electrical equipments. To maintain ovar all electrical system for the reliable and smooth plant operation.
To diagnose cause of electrical multifuntion or failure of operational of all electrical system as well as equipments such as Motors,Generator,Transformer,VCBs,ACBs, protection relay,Switchgear,Batteries and charger system. Data updating on SAP base (CMMS) Computrize Maintenance Management System for Preventive and corrective maintenance and also inventory management.
Good Knowledge of HSE managemenet system Such as (PTW) Permit to work job safety analysis and risk assessment.
Use CMMS (Computerize Maintenance Management System) for Preventive maintenance and Corrective maintenance and also inventory management. Good Knowledge of HSE Management system such as PTW (Permit to work) Hot Cold and Confined Space permit job safety analysis and risk assessment. Uses of measuring and Test Equipment Such As H.T & L.T Magger, Earth Tester, Phase sequence indicator, Digital multi meter, Digital clamp meter, Motor Vibration meter, thermography meter & lux meter. Maintenance and Troubleshooting 11KV Switchgear 6.6Kv Motor and Generators. Installation Testing of Protection Relay Schneider Micom and CEE like O/C, S/C, E/F Under voltage, Differentional, Supervision and Tripping Relays. Maintenance and Troubleshooting Power and Distribution Transformer. Maintenance of MCC (Motor Control Center) DOL Starter, Star Delta, Reverse Forward and ATS. Installation 303Kw and 143Kw Solar System. Cathode Protection Test of Pipe Line. Maintenance Power Factor Banks and DC 220v and 48v batteries and Charger. Termination of power Cable MV 11kv, 33kv (Heat Shrink) and (Cold Shrink) and Megger insulation testing of Power and control cable.
132kv duplex penal control Fault tracing with the help of Schematic drawing.
11 Kv switchgear VCB circuit breaker.
Installation Micom Relay P115 & P122 overcurrent short circuit earth fault.
Differential relay.
Maintenance of power& distribution transformer & 11kv feeder.
Mcc penal Lv module fault tracing.
Troubleshooting.
Installation CT and PT.
Termination and Testing of LV 440 & HT 11kv cable.
Installation energy meter .
Meggering of HT & LV cable.
Check vibration &Thermography of motor.
Electrical Troubleshooting