خلاصہ

Dear Sir,

My name is Syed Noman Ali Shah,

I have in total more than 6 years of experience in the field of civil engineering in all sectors like bridges, roads, buildings , infrastructure , structural design , project management and scheduling , power projects , heavy turbines foundations , piling activities ,

Recent i have worked on many power projects as a consultant my company is affialiated with a german company Lahmeyer International and i have worked with many international experts and companies like HYDROCHINA, SIDRI, CGGC , CSCEC , Power china , HUBEI INTERNATIONAL , CHOTIAN , SHUNTIAN , HAWA , ARTISTIC MILLINERS , HARTFORD , UEP , CHINA THREE GORGES, GE , SGURR , TUV , JS , JCM , IFC , OPEC , my completed projects and those projects in which i was the part are as under,

Resident civil engineer at wind power projects
Completed -100 megawatt UEP wind project
Completed -100 megawatt Three gorges wind project
Completed -50 megawatt AEPL wind project
Completed -50 megawatt HAWA wind project
Lenders Engineer at : 660 MW Thar coal project
Lenders Engineer at : 660 MW Lucky coal project
Lenders Engineer at : 50 MW Zaphyre offshore wind project
Willing to relocate: Anywhere

پراجیکٹس

Resident civil engineer at wind power projects Completed -100 megawatt UEP

تجربہ

کمپنی کا لوگو
Project manager
Dolmen (Pvt.) Ltd.
ستمبر ۲۰۱۸ - موجودہ | Karachi, Pakistan

As a project manager I worked on the the complete project management on Primavera check the engineering , management ,review and implementation of drawings, site construction , quality management of the project.

کمپنی کا لوگو
RESIDENT CIVIL ENGINEER
RENEWABLE ENERGY RESOURCES
اگست ۲۰۱٦ - ستمبر ۲۰۱۸ | Karachi, Pakistan

RESIDENT CIVIL ENGINEER at RENEWABLE ENERGY as civil design and site engineer since 1stsep 2016 , on a wind projects of UEP of 100 megwatt and CTG(China three gorges) of 100 megawatt ,Hartford 50 megawatt , HAWA 50 megawatt , 50MW master wind project

Visited 660 MW thar coal project as a lenders engineer from Lahmeyer and banks, evaluated the power plant construction activities and mining activities.

Visited 660 MW Lucky coal project as a lenders engineer from Lahmeyer and banks, evaluated the power plant site , layout study , feasibility study , risk assessment

Visited 50 MW Zaphyre wind project as a lenders engineer from Lahmeyer and banks, evaluated all construction activities , piling activities , Mass concrete of WTG foundation activities , substation civil works

My company has a joint venture with international German company LAHMEYER INTERNATIONAL, And I also worked with many international companies in this project like HYDROCHINA, SIDRI, CGGC , CSCEC , Power china , HUBEI INTERNATIONAL , CHOTIAN , SHUNTIAN , HAWA , ARTISTIC MILLINERS , HARTFORD , UEP , CHINA THREE GORGES

-Making WBS on primavera
-Supervision of all civil activities
-Analyzing and making whole schedule of project
- Review of structural drawings and all construction documents
- Implementation of drawings on site
- Managing all the site activities
- Managing the all documents and contracts work
- Maintaining the schedule and breakdown structure
- Structural drawings modification / as-built drawings
-Making the latest forecast
-Managing building, roads, culverts , large foundations civil works
-Quality assurance and quality control of all civil works
-Laboratory testing and monitoring of all lab activities regarding civil works , cube crushing,fdt , proctor test , etc
- Leading the meetings with the stakeholders and reviewing the mom

کمپنی کا لوگو
CONSTRUCTION MANAGER
PROGRESSIVE BUILDERS
جولائی ۲۰۱٦ - اگست ۲۰۱٦ | Karachi, Pakistan

CONSTRUCTION MANAGER at PROGRESSIVE BUILDERS as civil design and construction engineer since june 2016, on a buildings of DHA Karachi

-Analyze the structural drawings
-Implementation of structural drawing on site
-Reviewing and modifying structural drawings
-Managing all the site activities of civil works

کمپنی کا لوگو
PROJECT SITE ENGINEER
OSMANI CONSULTANTS
ستمبر ۲۰۱۵ - جولائی ۲۰۱٦ | Karachi, Pakistan

PROJECT SITE ENGINEER at OSMANI CONSULTANTS as a road specialist , construction supervision ,planning and cost estimation engineer for DHA PHASE 8 project over the area of 500 acres (Since September 2015)

-Construction supervision of all infrastructure and superstructure work
-Construction supervision of all internal and main roads over 500 acres plotting area , analyzing pci and distresses in roads
-Construction supervision of STP (sewerage treatment plant) , pumping station , graveyard , drains , tennis and skating courts , buildings .
-Planning of the project on primavera
-Cost estimation and preparation of BOQ
-Allotting and managing the resources, man power, material and machinery
-Managing the cash in flow and out flow , -understand the work scope, quantity and familiar with logical sequence
-preparing the work breakdown structure, -analyzing the gaps between planned and actual progress
-supervision of the civil work including the subcontracting, -preparation of the master schedule

کمپنی کا لوگو
CONSTRUCTION MANAGER
CONEX
مئی ۲۰۱۵ - اگست ۲۰۱۵ | Karachi, Pakistan

CONSTRUCTION MANAGER at CONEX , for the bungalows and buildings construction at DHA .
-Planning and cost estimation
-Concrete mix design and Quantity analysis of all the construction works and finishes
-Site supervision and management of all civil works
-designing the drawings on AutoCAD according to plan
-managing the concrete plant for the construction of various design of products
- landscaping implementation and design and marketing.

کمپنی کا لوگو
Civil Structural Design Engineer
al-ajwad consulting engineers
مارچ ۲۰۱۵ - مئی ۲۰۱۵ | Jeddah, Saudi Arabia

DESIGN ENGINEER at AL-AJWAD CONSULTANTS, (JEDDAH), (Nasir and sons co.)
(consulting, design, planning, supervision, implementation) worked as structure design engineer,
Road design engineer, quantity engineer in JEDDAH
- Structural design of different villas, fillas , apartments on etab
- Site supervision and checking of my designed projects that work is done according to the design and the supervision of all civil work was my task.
- Road design of Dhaban Ewaan project , Ali al-murtada project, etc. , designed complete grading plan , profile plan, contour ,slope banding, elevation banding plans on CIVIL 3d.
- Find out the quantity of cut and fill of different projects like king abdullah city, rabigh, khules, mishal projects etc. on civil 3d
- Prepared the krookies of different projects ,Used gps at different sites for surveying work ,Used digital laser meter for the measurement of different sites
-Quantity surveying of all materials used in different villas has been done by me first measured them at site than prepared its BOQ
-Prepared all the documentation work of a project ,Prepared the qarar zara,-Prepared the taqrir moaina
-Prepared the Gsi file on Leica survey office ,-Processed the raw data of gps in Leica geo office
-Imported the survey points on CIVIL 3d of that processed data and prepared the cad file

کمپنی کا لوگو
CONSTRUCTION ENGINEER
AL-MISBAH consulting engineers
جولائی ۲۰۱۴ - مارچ ۲۰۱۵ | Karachi, Pakistan

CONSTRUCTION ENGINEER at AL-MISBAH consulting engineers, (July 2014 to march 2015) worked as a construction engineer at different sites and structure engineer at office for 8 months.
These are sites: Anwar tower, Gulistan-e-johar bungalow, Gulshan bungalow , Gulberg tower, etc.
My main site was Anwar tower (B+G+4),I have designed it and implemented the site initially from foundations ,plinth ,basement till the second story of (B+G+4) building, I had different tasks:
-Concrete mix design management. , -Structural design on etab
-Working on primavera & Microsoft Project for planning. , -Work BreakDown Structure and scheduling. , -Checking the alignment, 90 , etc . of the building, -Making of the daily schedules.
-Making sure the construction according to site, -Managing levels through the help of water level -Bar bending schedules , -Managing the labors
-Managing the shuttering work, checking all the perimeters of the shuttering which are necessary for the construction purposes.
-Taking the suitable decisions according to the site like where sunk slab should be given or where concealed beam is necessary, etc.
-Managing the reinforcement work according to the drawing, making possible the spacing between the bars, dia of the bar, bar size, according to the site and drawings.
-Calculation of the different quantities like, concrete, cement bags, blocks, reinforcement, etc

کمپنی کا لوگو
PROJECT ENGINEER
Mehram Traders
جون ۲۰۱۳ - جولائی ۲۰۱۴ | Karachi, Pakistan

PROJECT ENGINEER at ZOT (ZULFIQARABAD OIL AND GAS TERMINAL) from
Last 1 year (June 2013 to July 2014) (Near PORT QASIM KARACHI)
It is a SITE over 200 acre I am Project Manager in Mehram Traders a Government
Contractor and It is project under KMC (Karachi Municipal Corporation). I am managing all the engineering work like:

-Bar Bending Schedule
-Working on total station , level machine and theodolite.
-Surveying Works (Coordinate & Levels)
-Management of the Batching Plant (Interpreting the different ratios of the concrete) -Quantity Surveying
-Cost Analysis of the Material used
-Machinery and the labor utilization
-Management of all the concrete works
-Material checking and testing by making cubes and cylinders
-Making possible working according to the structural drawings and profile. -Difference of the base courses has been calculated. (Levels, FRL, NGL)

کمپنی کا لوگو
CIVIL ENGINEER
trainee engineer
جون ۲۰۱۲ - جولائی ۲۰۱۳ | Karachi, Pakistan

CIVIL ENGINEER (trainee engineer) at MEHRAN HIGHWAY from the Consultant NAA , KMC project
-pavement inspection and whole civil works were managed at June 2013.
-Checking of the different base courses.
-Managing the work according to the profile and levels.-Checking the quality of asphalt pavement.
-Managing the all civil works at site.
-Calculation of the different base course according to the site.-Management of the labors. -Managing the daily schedules.

کمپنی کا لوگو
trainee engineer
NESPAK
جنوری ۲۰۱۲ - جون ۲۰۱۲ | Karachi, Pakistan

NESPAK: (trainee engineer) (June 2012)"Project management division" our project was BBIA (Benazir Bhutto international airport) , A project of 50 billion ,I have analyzed whole procedure of the CONTRACT DOCUMENTATION ( FIDIC) , from the procurement of the project then financial and technical proposals have been made and whole construction drawings, structural drawings have been analyzed.

کمپنی کا لوگو
trainee engineer
PARAGON CONTRACTORS
جون ۲۰۱۱ - دسمبر ۲۰۱۱ | Karachi, Pakistan

PARAGON CONTRACTORS: (trainee engineer) (December 2011) "Site Supervisor at the AL- KARAM textile mills warehouse construction, My work was Quantity analysis , reinforcement scheduling and whole site management.

تعلیم

NED University of Engineering & Technology
ماسٹرز, ماسٹرز ان سائنس, ‎
Structural Design and Analysis
2018
NED University of Engineering & Technology
بیچلرز, , Bachelor of CIVIL ENGINEERING‎
Construction Studies
2013

پیشہ ورانہ مہارتیں

ماہر Civil Planing
ماہر Handling Assignments
ماہر Prohect Management
ماہر رسم الآلات

زبانیں

ماہر انگریزی