Dynamic Mechanical Engineer with a solid background in both site engineering and
CAD design. Possessing hands-on experience in executing and managing
engineering projects, coupled with expertise in utilizing CAD software to develop
precise and innovative designs. Proven ability to thrive in fast-paced environments,
ensuring project completion within tight deadlines while maintaining the highest
standards of quality and safety. Skilled in collaborating with multidisciplinary teams
to achieve project objectives and exceed client expectations. Seeking to leverage
my diverse skill set and practical experience to contribute effectively to a
progressive engineering team.
Contributed to the Kinder Morgan natural gas pipeline remediation project by
playing a key role in creating accurate As-Built drawings using AutoCAD.
Demonstrated proficiency in AutoCAD software to efficiently create, modify, and
update drawings, incorporating revisions and annotations as necessary to reflect
actual field conditions and changes.
Supported the renewable department by leveraging Civil 3D to generate KMZ
files, facilitating efficient data exchange and visualization of project information
for stakeholders.
Played a pivotal role in formwork points creation, collaborating with project
teams to accurately define construction layouts and establish reference points
for structural elements, ensuring precision and alignment during construction
activities.
As an Apprentice Technical Assistant at Pakistan Industrial Technical Assistance Center (PITAC) Lahore Pakistan from July 2015 to October 2017, I was responsible for operating various machines such as lathes, milling machines, surface grinders, CNC machining centers, and injection molding machines.
Additionally, I was involved in heat treatment and quality control of the produced parts. I was also responsible for maintaining and repairing machines and equipment as needed. This experience provided me with hands-on experience in manufacturing operations and the ability to work efficiently in a fast-paced environment.
Managed on-site construction activities, ensuring adherence to project
specifications, safety standards, and regulatory requirements.
Oversaw the execution of plumbing installations in both residential housing and
high-rise buildings, coordinating with subcontractors, suppliers, and other
stakeholders to ensure timely completion.
Provided technical guidance and support to site personnel, including laborers
and technicians, to ensure compliance with project plans and specifications.
Prepared and maintained accurate documentation, including daily progress
reports, site records, and as-built drawings, to support project documentation
and future reference.