خلاصہ

To work in a dynamic, competitive and cooperative environment in a reputable organization, where there is a maximum chance of learning and growth as a proficient, innovative and committed person in accordance with organization's policies.

تجربہ

کمپنی کا لوگو
Computer Technician
Phone Tel (PVT) Ltd.
فروری ۲۰۱٦ - موجودہ | Islamabad, Pakistan

Following are my responsibility as computer Technician
• Operating Systems – Win XP, 7, 8, 10,
• Microsoft Office suites – 2003/2007/2010
• Various types of PC hardware such as, Apple/Mac, Dell, HP and Toshiba
• Hard drives, monitors, printers, scanners and video equipment

کمپنی کا لوگو
FM Engineer
Ericsson Pakistan (Pvt.) Limited
جنوری ۲۰۱۳ - جنوری ۲۰۱٦ | Islamabad, Pakistan

Ericsson Warid MS Project (Jan 2014 – Jan 2016)

Transmission
• Skilled in Installation, commissioning and troubleshooting of Minilink E classic, Traffic Node 6P, Traffic node 20P & Traffic Node 2P.
• Skilled in Installation, commissioning and troubleshooting of Minilink High Cap.
• Experienced in doing Preventive Maintenance Routine Site (PMR) visits of Transmission links.
• Experienced in installation of Rectifiers to support microwaves.
• Experienced in RSL improvement/ link alignment activities.
• Experienced in Acceptance and Quality assurance visits of microwave links.
BTS
• Skilled in Installation and commissioning/ Integration of RBS 2206, 2207, 2106, 2107, 2106i, 2216, 2116, 6102, 6201, 6601, and 2308(Micro cell), Nano Cell.
• Skilled in troubleshooting of Internal alarms of RBS.
• Experienced in patching external alarms and testing in OMT.
• Experienced in doing Preventive Maintenance Routine Site (PMR) visits of RBS.
• Installation of battery banks to support RBS.
• Experienced in Acceptance and Quality assurance visits of BTS sites.
• Experienced in resolving call drop issues related to hardware

Egyptian Pakistani Telecommunication Services Company(Mobilink MS) Jan 2013- Jan 2014

I am having the core responsibilities as: Transmission Engineer

• Up gradation of MW links both capacity and protection wise
• Performed transmission field survey (LOS Tests, Path Surveys)
• Commissioning and configuring all types of NEC MW.
• Interference tests for MW links
• Alignment and RSL improvement of SD links and hot standby links.
• Troubleshooting of alarms like HIBER and LOW-BER.
• LB1 and LB2/media verification
• Up gradation of traffic sheet.

تعلیم

Preston University
بیچلرز, بیچلرز ان ٹیکنالوجی, Electronics‎
Communication Networks
CGPA 3.1/4
2014