3.8 MW Power Plant Maintenance & Utility incharge, united towel exporters.
Aga khan 2MW Genset Installation design and Air Inlet Outlet system modification.
Project of Fire and Electrical Hazard identification on Telenor All Pakistan Core sites.
Installation & Commissioning of small Gensets.
Responsible for product inquires from customer sales channel, technical inquiries, application specific support, preparing quotation as per client requirement, consulting direct with customer sales channel.
Design interface solution, Energy auditing,. Designing of WHR Boiler, Heat recovery steam generator(HRSG), Selecting of steam turbine, condensing turbine, extraction turbine, gas turbine.
Electrical Load Calculation+ Electrical Power Generation on Various Fuels, Steam calculation for power & process.
Preparing RFQ, Preparing feasibility, Comparing quotations from different vendors, Final negotiations meetings. Contract preparation, Preparing weekly project progress chart.
Weekly monitoring the project progress, executing project according to time deadline, Meeting with vendors, arranging material. Material transportation to the site, Crain age, rigging, placement and foundations.
Additional Project engineering work:
Fauji Meat, Hot Water & Steam fired boiler. Ahmed Textile Mills, WHRB Boiler.
UEP Oil/Gas field Tando adam, Solar power plant. K-Electric BQPS-1 Power Station, Boiler tubes replacement.
Siddiqsons Ltd Ocean Tower, CO2, Condensate & Energy recovery from Flue gases (Pre bid stage)
Equipment performance evaluation.
Plant Performance Analysis.
Operations.
Technical report writing.
Feasibility Report.
Boilers, Compressors, 7 Humidification plants, lifts, Factory maintenance & utility works(Sizing, Warping, sectional warping, Folding, weaving, Power Genset), new projects designing & old system modification, preparing BOQ, installation & commissioning works, 1000 GPM fire hydrant system CLARK US (complete designing, preparing BOQ, installation and commissioning work).
Research & design of Blower Impeller, axial fan, according to ASME standard designing of De-aerator, vessel, diesel storage tanks, feed water tank, Inline cabinet fan structure. Material procurement, Installation & commissioning of Diesel Genset.
Design & Fabrication of high temperature ( 620C ) Burner SS Impellers. Installation & Commissioning of 450 Tons Chiller cooling towers. Air compressor overhauling.
Solar power system design and installation complete. Generator Maintenance work.
Energy audit Boiler and Chillers area complete.
Compressor,Chiller & HVAC), daily schedule maintenance, major & minor overhaul of gas generator, overhaul of Atlas Copco air compressor, Daily report maintain, parts maintenance. Propose of new 4.5 MW MTU gas generators & its feasibility report, piping layout with WHRB & hot water absorption chiller layout drawing in United Towel Exporter Pvt Ltd from February 2017 to January 2019.
JOB EXPERIENCE:
1. Worked as an Assistant Manager (Design & Application) in Energy Solution (Pvt.) Ltd from Jan. 2016.
Job Description:
Aga khan 2MW Genset Installation design and Air Inlet Outlet system modification.
Project of Fire and Electrical Hazard identification on Telenor All Pakistan Core sites.
Installation & Commissioning of small Gensets.
2. Worked as an Application Engineer in Gresham's Eastern Pvt Ltd from Oct 2014 to Jan 2016 (1Year, 3 months).
Job Description:
Responsible for product inquires from customer sales channel, technical inquiries, application specific support, preparing quotation as per client requirement, consulting direct with customer sales channel.
Design interface solution, Energy auditing,. Designing of WHR Boiler, Heat recovery steam generator(HRSG), Selecting of steam turbine, condensing turbine, extraction turbine, gas turbine.
Electrical Load Calculation+ Electrical Power Generation on Various Fuels, Steam calculation for power & process.
Preparing RFQ, Preparing feasibility, Comparing quotations from different vendors, Final negotiations meetings. Contract preparation, Preparing weekly project progress chart.
Weekly monitoring the project progress, executing project according to time deadline, Meeting with vendors, arranging material. Material transportation to the site, Crain age, rigging, placement and foundations.
Additional Project engineering work:
Fauji Meat, Hot Water & Steam fired boiler. Ahmed Textile Mills, WHRB Boiler.
UEP Oil/Gas field Tando adam, Solar power plant. K-Electric BQPS-1 Power Station, Boiler tubes replacement.
Siddiqsons Ltd Ocean Tower, CO2, Condensate & Energy recovery from Flue gases (Pre bid stage)
3. Trainee engineer in Boiler Department, K-Electric BQPS-1 from April 2014 to Sep 2014 (6 Months).
Job Description:
Equipment performance evaluation.
Plant Performance Analysis.
Operations.
Technical report writing.
Feasibility Report.
(Boiler and Power Plant designing and Manufacturing company)