An energetic, innovative and enthusiastic engineer with a diversified and more than 9 years of experience, strong background of managing large teams, engineering project delivery and designing solutions in top MNCs(Gulf region)
A resourceful and proactive professional looking for technical challenges and implementing complex mechanical concepts to drive improvements in productivity and quality within allocated resources budgets and timelines
Possesses sound technical knowledge of HSE related practices in Oil & Gas industry with hands on experience and interest in fabrication, erection and planning of piping and execution services in construction industry
Strong engineering and methodical aptitude of problem solving with an innate ability to analyze problems and devise creative solutions under high pressure, dangerous and extremely difficult conditions
Field Engineering and Construction management and coordination with subcontractors
Efficacious and fortuitous installation of Power Plant capacity 18 MW MAN Diesel/Fuel Engine
Fabrication and Installation of Storage Tanks
Erection of Vessels, Columns and Flare System
A 12,500 BPSD DHDS unit installation for low sulpher high speed diesel and Pre-flash Unit 12,400 BSPD.
Refinery shut down revamping work and Reformer Modification and 7000 BPSD Capacity isomerization unit
Chemical Cleaning and pre commissioning activities along with Tie-Ins job with existing Plant
Eminent and efficient construction of 49 well heads, 300 KM Pipeline and Facility Processing Plant
Successfully achieved all targets in IRAQ within stipulated timelines and budget
Field Engineering and construction management and coordinating with subcontractors
Fortuitously supervised fabrication of spools 36000 DIA INCHES on within stipulated time and eminent supervision fabrication of 300 tons supports at workshop.
Outstanding supervision of erection/installation of piping spools at site and supervised pipe supports erection 200 tons in designated area.
Also worked on SHUTDOWN of Takreer Refinery for MOC and Revamping work of Piping.
GRE Piping works during turnaround of Takreer Refinery Abu Dhabi.
Efficient laying, pigging, hydro testing and commissioning of 50km long DIA 36” pipeline along with triumphant fabrication and erection work for 12 finger and 48” Dia slug catcher
Efficacious erection and installation of piping work for 9 well heads along with 128 meter high Flare, knout drum and facility piping
Triumphant completion and erection of 120000 DIA inches piping within stipulated time and fabricated tank 50 meter DIA
Fabricated tank 50 meter DIA with auspicious vacuum leak testing and hydro testing of tank under strict deadlines
Efficacious and fortuitous installation and erection of 11 cooling towers/Air cooler (50 Tons/12 Meters) and Compressors (16 Tons) and 3 Storage Tanks
Auspicious erection and completion of 37 Pumps (5 Tons), Heat Exchangers, Vessels, Steel Structures both grounded and ungrounded
Supervised fabrication and field installation of all piping and Pipe supports work for A/G and U/G process and utility Piping