11 years experience in buildings,oil&gas, refineries and power plants in epic and construction and infrastructure projects as site engineer cum QA QC civil
Worked as site QA/QC and execution Engineer civil at Kamran construction
• Execution for Excavation, compaction, lean, base, walls steel and concrete works
For dyke walls, support, cross over, structural foundations
• precasting of raft foundation for structures and cross overs
• Supervise finishing and painting works for building, permanent dyke walls and foundations, installation of raised floors
Grouting works for foundations
• Erection of precast items at location by heavy equipment
• Site inspection before submission of RFIS to client QA/QC
• Paving and foundation construction and all arrangement
• Laying and jointing of sweet water, sewage and sewerage lines based on Cost iron, HDP, PVC material.
• Waterlines and manholes excavations, concreting and backfilling according to client specifications before proceeding RFIS to client
Handling of all Site Engineering, HSE, QA/QC and execution activities with target chasing capabilities.
Monitored and support the Construction activities paying particular attention to Safety, Health, Environment, Quality, Cost and Schedule. Review and comprehend documents and manuals that incorporate these key areas.
To take Responsibility for the overview of sub-contractor performance for allocated areas of responsibility. Also involved in planning and installation of Structural steel, piping and Mechanical equipment (SMP). Inclusive is the management of any testing in accordance with drawings and specification and Project Standards and coordination of the works.
To identify materials, tools, labor, and equipment which may be required
Project milestones and Schedules and check that the sub-Contractor to
has adequate source to suit.
To complete punch list items in a timely manner in accordance with project standards to meet turnover dates in a safe methodical manner. also responsible for co-ordination of other disciplines and team members to close punch list items, include liaising with Start Up groups and others and organizing and facilitating meetings
To make sure that the sub contractor’s recording and reporting of safety is per the project’s requirements (timeliness and chain of command).
Meet or beat weekly quantities to be installed to support Project schedule in a safe methodical manner
To Understand the Scope of Work with reference to my work packs and areas of responsibility and understand and plan to install quantities per the schedule.
Attend and conduct all meetings as required including but not limited to: Interface, 3 Week look ahead, 120 Day Review, Coordination site meetings in facility’s, Contract Meeting and Readiness meetings.
Monitor schedule and ensure materials and equipment are supplied on time. In the event that deliverables are late, be proactive and optimistic with a
• Supervision and layout marking for Construction of Multi Stories Buildings and road Culverts ,sewage tanks, excavations .concreting ,finishing works
• Lay out making and surveying works For 3 Story 300 Beds Residential Labor/Staff Building.
• Supervision of Masons, Carpenters, Labor And
Foremen/Charge Hands.
• Measuring of work done of subcontractor for further payments of bills
• Daily Giving Of Survey Points by Using Of Auto level
• Daily Given Reports to Project Manager.
• Bar Bending Scheduling For Steel Activities.
• Stay On Concreting/Site Till The Finishing Of Work